Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
108
matching recommendationsNAICS | 322 | Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0275 # 04 Y:2003 | 04 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,207 | $4,563 | Implemented |
NC0275 # 05 Y:2003 | 05 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $455 | $683 | Implemented |
TA0064 # 01 Y:2003 | 01 | 2003 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $9,350 | $1,800 | Implemented |
TA0064 # 04 Y:2003 | 04 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,770 | $0 | Implemented |
TA0064 # 07 Y:2003 | 07 | 2003 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $101 | $211 | Implemented |
TA0064 # 05 Y:2003 | 05 | 2003 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,740 | $520 | Implemented |
NC0270 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,246 | $2,400 | Implemented |
NC0270 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $149,890 | $50,000 | Implemented |
NC0270 # 05 Y:2003 | 05 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,551 | $0 | Implemented |
NC0270 # 04 Y:2003 | 04 | 2003 | ADJUST BURNERS FOR EFFICIENT OPERATION | $16,620 | $1,000 | Implemented |
TA0063 # 04 Y:2003 | 04 | 2003 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $18,000 | $11,210 | Implemented |
TA0063 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $140 | $270 | Implemented |
TA0063 # 01 Y:2003 | 01 | 2003 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $27,915 | $0 | Implemented |
TA0063 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,730 | $17 | Implemented |
NC0266 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $604 | $300 | Implemented |
NC0266 # 03 Y:2003 | 03 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,941 | $2,157 | Implemented |
NC0266 # 06 Y:2003 | 06 | 2003 | INSULATE BARE EQUIPMENT | $61 | $132 | Implemented |
NC0266 # 05 Y:2003 | 05 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,833 | $1,189 | Implemented |
NC0266 # 02 Y:2003 | 02 | 2003 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,628 | $4,597 | Implemented |
NC0266 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $744 | $1,456 | Implemented |
UM0240 # 02 Y:2003 | 02 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $17,060 | $5,000 | Implemented |
UM0240 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,120 | $1,000 | Implemented |
UM0240 # 05 Y:2003 | 05 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $14,410 | $5,000 | Implemented |
UM0240 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,305 | $500 | Implemented |
UM0240 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $16,440 | $2,500 | Implemented |