IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,971

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0294 # 04 Y:2004 04 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,247 $2,660 Implemented
WV0294 # 05 Y:2004 05 2004 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $509,116 $20,000 Not Implemented
WV0294 # 06 Y:2004 06 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,472 $920 Implemented
WV0294 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,431 $784 Implemented
WV0294 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,317 $215 Implemented
WV0294 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $609 $46 Implemented
WV0294 # 10 Y:2004 10 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $232 $129 Not Implemented
SU0189 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,275 $0 Not Implemented
SU0189 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,940 $0 Implemented
SU0189 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,291 $378 Implemented
SU0189 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,591 $1,175 Implemented
SU0189 # 05 Y:2004 05 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $49,312 $60,000 Implemented
SU0189 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $36,510 $45,708 Not Implemented
LM0076 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $528 $25 Implemented
LM0076 # 02 Y:2004 02 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,952 $1,300 Implemented
LM0076 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $255 $281 Implemented
LM0076 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,953 $3,825 Not Implemented
LM0076 # 05 Y:2004 05 2004 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,736 $2,500 Implemented
LM0076 # 06 Y:2004 06 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,766 $1,500 Not Implemented
LM0076 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,513 $880 Implemented
SD0332 # 01 Y:2004 01 2004 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $164,104 $609,600 Not Implemented
SD0332 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,679 $475 Implemented
SD0332 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,765 $900 Implemented
SD0332 # 04 Y:2004 04 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,750 $6,000 Not Implemented
SD0332 # 05 Y:2004 05 2004 INSTALL SKYLIGHTS $3,460 $7,015 Not Implemented