IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0519 # 01 Y:2014 01 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $207,427 $102,000 Implemented
NC0519 # 04 Y:2014 04 2014 REPAIR AND ELIMINATE STEAM LEAKS $21,819 $2,200 Implemented
NC0519 # 03 Y:2014 03 2014 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $104,811 $52,500 Implemented
NC0519 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,850 $500 Implemented
NC0519 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $67,692 $258,028 Implemented
WV0401 # 03 Y:2010 03 2010 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $38,419 $128,000 Implemented
WV0401 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,792 $7,958 Implemented
WV0401 # 06 Y:2010 06 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,226 $20,400 Implemented
WV0401 # 08 Y:2010 08 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,432 $2,028 Implemented
WV0401 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,622 $312 Implemented
WV0401 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,182 $2,886 Implemented
WV0401 # 13 Y:2010 13 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,239 $1,000 Implemented
WV0401 # 14 Y:2010 14 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $536 $52 Implemented
WV0401 # 02 Y:2010 02 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $57,379 $6,240 Implemented
NC0360 # 02 Y:2007 02 2007 REPAIR AND ELIMINATE STEAM LEAKS $9,594 $2,250 Implemented
NC0360 # 01 Y:2007 01 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $20,317 $10,000 Implemented
NC0360 # 04 Y:2007 04 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $12,267 $0 Implemented
NC0360 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $12,731 $12,000 Implemented
NC0360 # 08 Y:2007 08 2007 USE PHOTOCELL CONTROLS $761 $750 Implemented
NC0360 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $836 $300 Implemented
NC0340 # 02 Y:2006 02 2006 CLOSE OFF UNNEEDED STEAM LINES $13,322 $0 Implemented
NC0340 # 04 Y:2006 04 2006 INSULATE FEEDWATER TANK $879 $220 Implemented
NC0340 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,998 $0 Implemented
NC0340 # 08 Y:2006 08 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $272 $500 Implemented
NC0340 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,390 $50 Implemented