Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
165
matching recommendationsNAICS | 322 | Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0032 # 08 Y:2008 | 08 | 2008 | USE MINIMUM STEAM OPERATING PRESSURE | $2,065 | $0 | Implemented |
DL0032 # 07 Y:2008 | 07 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,521 | $643 | Implemented |
DL0032 # 06 Y:2008 | 06 | 2008 | REPLACE BOILER | $6,100 | $6,100 | Implemented |
DL0032 # 05 Y:2008 | 05 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,400 | $7,500 | Implemented |
DL0032 # 01 Y:2008 | 01 | 2008 | REPLACE BOILER | $30,400 | $55,000 | Not Implemented |
DL0032 # 02 Y:2008 | 02 | 2008 | REDUCE VENTILATION AIR | $19,700 | $1,200 | Implemented |
DL0032 # 03 Y:2008 | 03 | 2008 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $12,400 | $7,000 | Not Implemented |
DL0032 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,639 | $31,781 | Implemented |
SF0368 # 07 Y:2008 | 07 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $781 | $1,851 | Not Implemented |
SF0368 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,195 | $0 | Implemented |
SF0368 # 08 Y:2008 | 08 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,812 | $56,073 | Implemented |
SF0368 # 09 Y:2008 | 09 | 2008 | USE SOLAR HEAT TO MAKE ELECTRICTY | $88,956 | $1,020,250 | Not Implemented |
SF0368 # 06 Y:2008 | 06 | 2008 | USE PHOTOCELL CONTROLS | $1,435 | $2,319 | Not Implemented |
SF0368 # 03 Y:2008 | 03 | 2008 | INSTALL OCCUPANCY SENSORS | $666 | $584 | Not Implemented |
SF0368 # 02 Y:2008 | 02 | 2008 | USE PHOTOCELL CONTROLS | $1,238 | $786 | Not Implemented |
SF0368 # 05 Y:2008 | 05 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $146 | $200 | Not Implemented |
SF0368 # 04 Y:2008 | 04 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,838 | $2,773 | Not Implemented |
NC0384 # 01 Y:2008 | 01 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,481 | $5,000 | Implemented |
NC0384 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,352 | $100 | Implemented |
NC0384 # 04 Y:2008 | 04 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $1,428 | $3,142 | Not Implemented |
NC0384 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,929 | $7,700 | Not Implemented |
NC0384 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,272 | $5,000 | Implemented |
NC0384 # 05 Y:2008 | 05 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,068 | $271 | Implemented |
NC0384 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,112 | $500 | Implemented |
UM0341 # 01 Y:2008 | 01 | 2008 | INSULATE BARE EQUIPMENT | $101,548 | $18,088 | Not Implemented |