Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
703
matching recommendationsNAICS | 3221 | Pulp, Paper, and Paperboard Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0636 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,946 | $18,000 | Implemented |
MA0636 # 05 Y:2008 | 05 | 2008 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $8,663 | $5,000 | Not Implemented |
MA0636 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,272 | $0 | Not Implemented |
MA0636 # 07 Y:2008 | 07 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,142 | $20,000 | Not Implemented |
UA0017 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,380 | $0 | Implemented |
UA0017 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $59,923 | $1,050 | Implemented |
UA0017 # 03 Y:2008 | 03 | 2008 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $33,016 | $402 | Implemented |
UA0017 # 04 Y:2008 | 04 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,880 | $314 | Implemented |
UA0017 # 05 Y:2008 | 05 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $22,989 | $0 | Implemented |
WV0365 # 01 Y:2007 | 01 | 2007 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $1,979,852 | $607,600 | Not Implemented |
WV0365 # 02 Y:2007 | 02 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $279,065 | $31,300 | Not Implemented |
WV0365 # 03 Y:2007 | 03 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $87,247 | $12,756 | Not Implemented |
WV0365 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $75,759 | $228,975 | Implemented |
WV0365 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,685 | $75,450 | Implemented |
WV0365 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,614 | $8,565 | Implemented |
WV0365 # 07 Y:2007 | 07 | 2007 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $9,063 | $39,000 | Not Implemented |
WV0365 # 08 Y:2007 | 08 | 2007 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,649 | $9,450 | Implemented |
WV0365 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,552 | $0 | Implemented |
WV0365 # 10 Y:2007 | 10 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,435 | $0 | Implemented |
WV0365 # 11 Y:2007 | 11 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,863 | $2,514 | Implemented |
SU0257 # 01 Y:2007 | 01 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $17,366 | $0 | Implemented |
SU0257 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,043 | $0 | Implemented |
SU0257 # 03 Y:2007 | 03 | 2007 | USE SYNTHETIC LUBRICANT | $4,349 | $0 | Implemented |
SU0257 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,124 | $1,000 | Implemented |
SU0257 # 05 Y:2007 | 05 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,261 | $712 | Implemented |