IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

460

matching recommendations
Reset
NAICS 32212 Paper Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0601 # 02 Y:2006 02 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $71,974 $10,118 Not Implemented
MA0601 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,368 $24,444 Implemented
MA0601 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,148 $18,975 Implemented
MA0601 # 05 Y:2006 05 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,090 $2,300 Not Implemented
MS0291 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $224,456 $74,722 Not Implemented
MS0291 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $42,324 $29,520 Implemented
MS0291 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $38,212 $8,550 Not Implemented
MS0291 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,523 $2,000 Not Implemented
MS0291 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,397 $233 Implemented
MS0291 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,825 $34,509 Not Implemented
MS0291 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $10,794 $1,853 Implemented
MS0291 # 08 Y:2006 08 2006 REPAIR AND ELIMINATE STEAM LEAKS $9,158 $169 Not Implemented
MS0291 # 09 Y:2006 09 2006 AIR CONDITION ONLY SPACE NECESSARY $6,088 $600 Not Implemented
MS0291 # 10 Y:2006 10 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $973 $0 Not Implemented
MA0585 # 01 Y:2005 01 2005 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $112,569 $254,000 Not Implemented
MA0585 # 02 Y:2005 02 2005 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $91,755 $254,400 Not Implemented
MA0585 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,100 $37,300 Implemented
MA0585 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,416 $37,300 Implemented
MA0585 # 05 Y:2005 05 2005 USE MINIMUM STEAM OPERATING PRESSURE $29,239 $23,014 Implemented
MA0585 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,480 $78,770 Implemented
MA0585 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,353 $9,225 Implemented
MA0585 # 08 Y:2005 08 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,385 $5,300 Implemented
MA0585 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,037 $5,300 Implemented
NC0328 # 01 Y:2005 01 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $8,068 $6,225 Not Implemented
NC0328 # 02 Y:2005 02 2005 BURN A LESS EXPENSIVE GRADE OF FUEL $113,412 $10,000 Not Implemented