Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
323
matching recommendationsNAICS | 322121 | Paper (except Newsprint) Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0894 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,290 | $0 | Implemented |
UD0894 # 09 Y:2013 | 09 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $10,400 | $40,600 | Not Implemented |
UD0894 # 01 Y:2013 | 01 | 2013 | USE MINIMUM COOLING WATER TO BEARINGS | $17,378 | $0 | Not Implemented |
UD0894 # 08 Y:2013 | 08 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $12,240 | $30,550 | Not Implemented |
UD0894 # 07 Y:2013 | 07 | 2013 | INSULATE BARE EQUIPMENT | $142 | $350 | Implemented |
UD0894 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,426 | $0 | Not Implemented |
UD0894 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,638 | $10,000 | Not Implemented |
UD0894 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,885 | $0 | Implemented |
UD0894 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $17,944 | $8,000 | Not Implemented |
OR0615 # 04 Y:2013 | 04 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,731 | $17,127 | Implemented |
OR0615 # 01 Y:2013 | 01 | 2013 | ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING | $24,283 | $1,000 | Implemented |
OR0615 # 05 Y:2013 | 05 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,352 | $36,600 | Not Implemented |
OR0615 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,601 | $4,986 | Implemented |
OR0615 # 02 Y:2013 | 02 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $48,896 | $68,866 | Implemented |
OR0615 # 03 Y:2013 | 03 | 2013 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $791,616 | $300,000 | Not Implemented |
UMS009 # 01 Y:2012 | 01 | 2012 | CLOSE OFF UNNEEDED STEAM LINES | $3,138,000 | $4,845,000 | Not Implemented |
UMS008 # 01 Y:2012 | 01 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $265,000 | $400,000 | Implemented |
UA3018 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,071 | $100 | Not Implemented |
UA3018 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,245 | $6,500 | Implemented |
UA3018 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $89,207 | $13,695 | Not Implemented |
UA3018 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,992 | $200 | Not Implemented |
UA3018 # 05 Y:2012 | 05 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $25,349 | $2,000 | Not Implemented |
UA3018 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $174,953 | $5,600 | Not Implemented |
UA3018 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,378 | $7,500 | Implemented |
IA0478 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,452 | $500 | Not Implemented |