IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 3222 Converted Paper Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0092 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $580 $105 n/a
NL0092 # 05 Y:2023 05 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $665 $1,360 n/a
NL0092 # 04 Y:2023 04 2023 COMBINE UTILITY METERS $948 $1,000 n/a
NL0092 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,226 $2,000 n/a
NL0092 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,380 $140 n/a
NL0092 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,092 $3,305 n/a
NL0079 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,949 $768 Implemented
NL0079 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,809 $2,875 Implemented
NL0079 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,699 $10,600 Implemented
NL0079 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,509 $4,500 Implemented
NL0079 # 01 Y:2023 01 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $30,717 $54,394 Implemented
NL0079 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,292 $128 Implemented
NL0079 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,953 $392 Implemented
NL0079 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,356 $2,892 Implemented
NL0026 # 01 Y:2018 01 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $28,240 $65,000 Not Implemented
NL0026 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,570 $69,390 Implemented
NL0026 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $1,000 Implemented
NL0026 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $0 Not Implemented
NL0011 # 04 Y:2017 04 2017 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $982 $0 Implemented
NL0011 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,135 $1,571 Not Implemented
NL0011 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,747 $20,139 Implemented
NL0011 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,874 $0 Not Implemented
IA0383 # 06 Y:2006 06 2006 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $159,390 $10,250 Not Implemented
IA0383 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $764 $605 Implemented
IA0383 # 02 Y:2006 02 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $581 $163 Not Implemented