IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

613

matching recommendations
Reset
NAICS 32221 Paperboard Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0023 # 04 Y:2024 04 2024 APPLY FOR INVESTMENT INCENTIVES $7,720 $0 Implemented
NT0023 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $36,182 $16,564 Implemented
NT0023 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,070 $5,609 Implemented
UF0612 # 08 Y:2024 08 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $7,481 $5,900 Implemented
UF0612 # 10 Y:2024 10 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,066 $2,320 Implemented
UF0612 # 06 Y:2024 06 2024 INSTALL TURBULATORS $13,749 $3,750 Implemented
UF0612 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $55,068 $30,945 Implemented
UF0612 # 03 Y:2024 03 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $45,994 $20,000 Implemented
UF0612 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,865 $8,523 Implemented
UF0612 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $44,735 $34,020 Implemented
NL0079 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,953 $392 Implemented
NL0079 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,356 $2,892 Implemented
NL0079 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,292 $128 Implemented
NL0079 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,949 $768 Implemented
NL0079 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,699 $10,600 Implemented
NL0079 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,809 $2,875 Implemented
NL0079 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,509 $4,500 Implemented
NL0079 # 01 Y:2023 01 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $30,717 $54,394 Implemented
DL0218 # 03 Y:2023 03 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,402 $750 Implemented
DL0218 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $11,159 $10,000 Implemented
DL0218 # 01 Y:2023 01 2023 REDUCE VENTILATION AIR $11,809 $0 Implemented
DL0218 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $90,882 $0 Implemented
CM1015 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,380 $23,925 Implemented
CM1015 # 04 Y:2022 04 2022 REPLACE BOILER $9,756 $43,140 Implemented
LE0512 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,383 $4,000 Implemented