IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 32221 Paperboard Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0290 # 07 Y:2005 07 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $365 $720 Implemented
UM0290 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,296 $1,950 Implemented
UM0290 # 04 Y:2005 04 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,753 $6,230 Implemented
UM0290 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,868 $2,650 Implemented
UM0290 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,268 $11,077 Implemented
UM0275 # 09 Y:2005 09 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,909 $1,000 Implemented
UM0275 # 08 Y:2005 08 2005 AIR CONDITION ONLY SPACE NECESSARY $4,727 $50 Implemented
UM0275 # 07 Y:2005 07 2005 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $4,883 $3,000 Implemented
UM0275 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,898 $500 Implemented
UM0275 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,025 $1,800 Implemented
UM0259 # 10 Y:2004 10 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,765 $200 Implemented
UM0259 # 11 Y:2004 11 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,700 $1,100 Implemented
UM0259 # 09 Y:2004 09 2004 REPAIR AND ELIMINATE STEAM LEAKS $1,893 $68 Implemented
UM0259 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,205 $825 Implemented
UM0259 # 07 Y:2004 07 2004 UPGRADE CONTROLS ON COMPRESSORS $3,423 $1,500 Implemented
UM0259 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,545 $75,000 Implemented
UM0259 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $12,337 $7,410 Implemented
UM0259 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $20,415 $11,200 Implemented
UM0240 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $28,120 $1,000 Implemented
UM0240 # 09 Y:2003 09 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,550 $1,100 Implemented
UM0240 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,305 $500 Implemented
UM0240 # 05 Y:2003 05 2003 UPGRADE CONTROLS ON COMPRESSORS $14,410 $5,000 Implemented
UM0240 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,440 $2,500 Implemented
UM0240 # 02 Y:2003 02 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $17,060 $5,000 Implemented