Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
94
matching recommendationsNAICS | 322211 | Corrugated and Solid Fiber Box Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0290 # 05 Y:2005 | 05 | 2005 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,242 | $0 | Not Implemented |
UM0290 # 04 Y:2005 | 04 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,753 | $6,230 | Implemented |
UM0290 # 03 Y:2005 | 03 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,868 | $2,650 | Implemented |
UM0290 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,268 | $11,077 | Implemented |
UM0290 # 07 Y:2005 | 07 | 2005 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $365 | $720 | Implemented |
UM0290 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,296 | $1,950 | Implemented |
UM0290 # 01 Y:2005 | 01 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $7,943 | $12,500 | Not Implemented |
NC0322 # 07 Y:2005 | 07 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $723 | $298 | Implemented |
NC0322 # 04 Y:2005 | 04 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $573 | $0 | Implemented |
NC0322 # 05 Y:2005 | 05 | 2005 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $2,592 | $821 | Implemented |
NC0322 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $462 | $100 | Implemented |
NC0322 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $217 | $2,000 | Implemented |
NC0322 # 03 Y:2005 | 03 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $74,009 | $100,000 | Not Implemented |
NC0322 # 02 Y:2005 | 02 | 2005 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $8,353 | $2,650 | Implemented |
NC0322 # 01 Y:2005 | 01 | 2005 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $139,400 | $9,500 | Implemented |
SU0217 # 01 Y:2005 | 01 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,867 | $0 | Implemented |
SU0217 # 04 Y:2005 | 04 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,785 | $500 | Implemented |
SU0217 # 08 Y:2005 | 08 | 2005 | OPTIMIZE PLANT POWER FACTOR | $3,979 | $14,487 | Implemented |
SU0217 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,763 | $954 | Implemented |
SU0217 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,819 | $0 | Implemented |
SU0217 # 07 Y:2005 | 07 | 2005 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $6,167 | $2,280 | Implemented |
SU0217 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,934 | $652 | Not Implemented |
SU0217 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,273 | $0 | Not Implemented |
MI0114 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $28,126 | $1,091 | Not Implemented |
MI0114 # 02 Y:2005 | 02 | 2005 | IMPROVE COMBUSTION CONTROL CAPABILITY | $20,574 | $30,050 | Implemented |