Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
444
matching recommendationsNAICS | 32222 | Paper Bag and Coated and Treated Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0390 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,075 | $0 | Not Implemented |
NC0390 # 04 Y:2009 | 04 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,533 | $50 | Implemented |
NC0390 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $379 | $432 | Not Implemented |
NC0390 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,223 | $50,369 | Not Implemented |
LE0286 # 01 Y:2009 | 01 | 2009 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $20,166 | $9,360 | Not Implemented |
LE0286 # 02 Y:2009 | 02 | 2009 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $15,000 | $40,000 | Not Implemented |
LE0286 # 03 Y:2009 | 03 | 2009 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,875 | $10,000 | Not Implemented |
LE0286 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,170 | $1,152 | Not Implemented |
LE0286 # 05 Y:2009 | 05 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,022 | $800 | Not Implemented |
LE0286 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,998 | $192 | Implemented |
LE0286 # 07 Y:2009 | 07 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,833 | $350 | Implemented |
LE0286 # 08 Y:2009 | 08 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,174 | $100 | Implemented |
LE0286 # 09 Y:2009 | 09 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,921 | $25,494 | Implemented |
BD0358 # 01 Y:2009 | 01 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,893 | $241 | Not Implemented |
BD0358 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $565 | $491 | Implemented |
BD0358 # 03 Y:2009 | 03 | 2009 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $10,495 | $3,961 | Implemented |
BD0358 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,911 | $2 | Not Implemented |
BD0358 # 05 Y:2009 | 05 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,734 | $501 | Not Implemented |
BD0358 # 06 Y:2009 | 06 | 2009 | REPLACE BOILER | $9,256 | $601 | Implemented |
BD0358 # 07 Y:2009 | 07 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $34,960 | $24,000 | Not Implemented |
BD0358 # 08 Y:2009 | 08 | 2009 | USE RADIANT HEATER FOR SPOT HEATING | $32,157 | $5,301 | Not Implemented |
BD0358 # 09 Y:2009 | 09 | 2009 | INSTALL AUTOMATIC PACKING EQUIPMENT | $339,206 | $5,001 | Implemented |
DL0032 # 01 Y:2008 | 01 | 2008 | REPLACE BOILER | $30,400 | $55,000 | Not Implemented |
DL0032 # 02 Y:2008 | 02 | 2008 | REDUCE VENTILATION AIR | $19,700 | $1,200 | Implemented |
DL0032 # 03 Y:2008 | 03 | 2008 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $12,400 | $7,000 | Not Implemented |