IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

439

matching recommendations
Reset
NAICS 32222 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0286 # 02 Y:2009 02 2009 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $15,000 $40,000 Not Implemented
LE0286 # 03 Y:2009 03 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,875 $10,000 Not Implemented
LE0286 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,170 $1,152 Not Implemented
LE0286 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,022 $800 Not Implemented
LE0286 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,998 $192 Implemented
LE0286 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,833 $350 Implemented
LE0286 # 08 Y:2009 08 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,174 $100 Implemented
LE0286 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,921 $25,494 Implemented
BD0358 # 01 Y:2009 01 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,893 $241 Not Implemented
BD0358 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $565 $491 Implemented
BD0358 # 03 Y:2009 03 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $10,495 $3,961 Implemented
BD0358 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,911 $2 Not Implemented
BD0358 # 05 Y:2009 05 2009 RECOVER WASTE HEAT FROM EQUIPMENT $24,734 $501 Not Implemented
BD0358 # 06 Y:2009 06 2009 REPLACE BOILER $9,256 $601 Implemented
BD0358 # 07 Y:2009 07 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $34,960 $24,000 Not Implemented
BD0358 # 08 Y:2009 08 2009 USE RADIANT HEATER FOR SPOT HEATING $32,157 $5,301 Not Implemented
BD0358 # 09 Y:2009 09 2009 $339,206 $5,001 Implemented
DL0032 # 01 Y:2008 01 2008 REPLACE BOILER $30,400 $55,000 Not Implemented
DL0032 # 02 Y:2008 02 2008 REDUCE VENTILATION AIR $19,700 $1,200 Implemented
DL0032 # 03 Y:2008 03 2008 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $12,400 $7,000 Not Implemented
DL0032 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,639 $31,781 Implemented
DL0032 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $8,400 $7,500 Implemented
DL0032 # 06 Y:2008 06 2008 REPLACE BOILER $6,100 $6,100 Implemented
DL0032 # 07 Y:2008 07 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,521 $643 Implemented
DL0032 # 08 Y:2008 08 2008 USE MINIMUM STEAM OPERATING PRESSURE $2,065 $0 Implemented