IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 322291 Sanitary Paper Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2001 # 03 Y:2020 03 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,354 $0 Implemented
CL2001 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,200 $61,410 Implemented
UK1704 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,480 $18,700 Implemented
UK1704 # 10 Y:2017 10 2017 CLEAN CONDENSER TUBES $2,467 $650 Implemented
UK1704 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $15,401 $43,120 Implemented
UK1704 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $5,402 $8,550 Implemented
UK1704 # 07 Y:2017 07 2017 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $9,390 $9,300 Implemented
UK1704 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,970 $0 Implemented
UK1704 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,756 $5,320 Implemented
UK1704 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,541 $0 Implemented
IP0056 # 02 Y:2016 02 2016 PAY BILLS ON TIME TO AVOID LATE FEES $1,368 $0 Implemented
IP0056 # 03 Y:2016 03 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,361 $0 Implemented
IP0056 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,759 $165 Implemented
IP0056 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,870 $300 Implemented
IP0056 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $311 $218 Implemented
NC0519 # 03 Y:2014 03 2014 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $104,811 $52,500 Implemented
NC0519 # 01 Y:2014 01 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $207,427 $102,000 Implemented
NC0519 # 04 Y:2014 04 2014 REPAIR AND ELIMINATE STEAM LEAKS $21,819 $2,200 Implemented
NC0519 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $67,692 $258,028 Implemented
NC0519 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,850 $500 Implemented
MI0231 # 03 Y:2012 03 2012 PAY BILLS ON TIME TO AVOID LATE FEES $13,801 $480 Implemented
MI0231 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $6,801 $800 Implemented
MI0231 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,414 $80 Implemented
MI0231 # 09 Y:2012 09 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,123 $1,160 Implemented
MI0231 # 10 Y:2012 10 2012 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,549 $843 Implemented