IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
NAICS 323 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0448 # 05 Y:2010 05 2010 REDUCE VENTILATION AIR $1,274 $2,000 Not Implemented
IA0448 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $21,840 $1,000 Implemented
IA0448 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $5,763 $2,360 Not Implemented
IA0448 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $2,798 $800 Implemented
IA0448 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,736 $1,440 Implemented
IA0448 # 07 Y:2010 07 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $371 $1,000 Not Implemented
IA0448 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,986 $50 Not Implemented
IA0448 # 09 Y:2010 09 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,501 $6,360 Implemented
BD0361 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $31,812 $45,980 Implemented
BD0361 # 07 Y:2009 07 2009 MODIFY STARTUP/SHUTDOWN TIMES $26,335 $18,750 Not Implemented
BD0361 # 06 Y:2009 06 2009 USE RADIANT HEATER FOR SPOT HEATING $3,152 $2,750 Not Implemented
BD0361 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,086 $2,000 Not Implemented
BD0361 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,411 $0 Not Implemented
BD0361 # 02 Y:2009 02 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,724 $0 Not Implemented
BD0361 # 01 Y:2009 01 2009 INSTALL OCCUPANCY SENSORS $1,093 $2,775 Implemented
IA0342 # 06 Y:2004 06 2004 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $7,150 $715 Implemented
IA0342 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $775 $344 Implemented
IA0342 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,335 $31,871 Not Implemented
IA0342 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,094 $888 Implemented
IA0342 # 04 Y:2004 04 2004 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,701 $1,500 Implemented
IA0342 # 05 Y:2004 05 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $10,625 $538 Not Implemented
IA0338 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $462 $0 Implemented
IA0338 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,854 $5,572 Implemented
IA0338 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $895 $2,750 Implemented
IA0338 # 06 Y:2004 06 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $74,749 $162,500 Implemented