Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
861
matching recommendationsNAICS | 32311 | Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0351 # 08 Y:2006 | 08 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,639 | $117 | Implemented |
WV0351 # 09 Y:2006 | 09 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,561 | $1,635 | Implemented |
WV0351 # 11 Y:2006 | 11 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $876 | $32 | Implemented |
UM0311 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,325 | $450 | Implemented |
UM0311 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,319 | $6,620 | Implemented |
UM0311 # 08 Y:2006 | 08 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,983 | $1,000 | Implemented |
UM0311 # 09 Y:2006 | 09 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,525 | $375 | Implemented |
UM0311 # 10 Y:2006 | 10 | 2006 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,316 | $370 | Implemented |
UM0311 # 11 Y:2006 | 11 | 2006 | INSULATE BARE EQUIPMENT | $578 | $659 | Implemented |
LE0244 # 01 Y:2006 | 01 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $19,350 | $1,000 | Implemented |
LE0244 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,690 | $1,000 | Implemented |
LE0244 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,950 | $1,024 | Implemented |
LE0244 # 04 Y:2006 | 04 | 2006 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $13,305 | $42,000 | Implemented |
LE0244 # 06 Y:2006 | 06 | 2006 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,252 | $50 | Implemented |
LE0244 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $4,751 | $450 | Implemented |
LE0244 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $61,139 | $68,713 | Implemented |
UF0383 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,179 | $126 | Implemented |
UF0383 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,149 | $1,296 | Implemented |
UF0383 # 08 Y:2006 | 08 | 2006 | PAY UTILITY BILLS ON TIME | $235 | $0 | Implemented |
BD0313 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $180,015 | $152 | Implemented |
BD0313 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,962 | $5,000 | Implemented |
BD0313 # 04 Y:2006 | 04 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $13,938 | $0 | Implemented |
BD0313 # 05 Y:2006 | 05 | 2006 | INSTALL TURBULATORS | $2,094 | $1,500 | Implemented |
BD0313 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,780 | $800 | Implemented |
BD0313 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,038 | $10,039 | Implemented |