IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

861

matching recommendations
Reset
NAICS 32311 Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0351 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,639 $117 Implemented
WV0351 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,561 $1,635 Implemented
WV0351 # 11 Y:2006 11 2006 DEVELOP A REPAIR/REPLACE POLICY $876 $32 Implemented
UM0311 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,325 $450 Implemented
UM0311 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,319 $6,620 Implemented
UM0311 # 08 Y:2006 08 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,983 $1,000 Implemented
UM0311 # 09 Y:2006 09 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,525 $375 Implemented
UM0311 # 10 Y:2006 10 2006 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,316 $370 Implemented
UM0311 # 11 Y:2006 11 2006 INSULATE BARE EQUIPMENT $578 $659 Implemented
LE0244 # 01 Y:2006 01 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,350 $1,000 Implemented
LE0244 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,690 $1,000 Implemented
LE0244 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,950 $1,024 Implemented
LE0244 # 04 Y:2006 04 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $13,305 $42,000 Implemented
LE0244 # 06 Y:2006 06 2006 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,252 $50 Implemented
LE0244 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $4,751 $450 Implemented
LE0244 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,139 $68,713 Implemented
UF0383 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,179 $126 Implemented
UF0383 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,149 $1,296 Implemented
UF0383 # 08 Y:2006 08 2006 PAY UTILITY BILLS ON TIME $235 $0 Implemented
BD0313 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $180,015 $152 Implemented
BD0313 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,962 $5,000 Implemented
BD0313 # 04 Y:2006 04 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $13,938 $0 Implemented
BD0313 # 05 Y:2006 05 2006 INSTALL TURBULATORS $2,094 $1,500 Implemented
BD0313 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,780 $800 Implemented
BD0313 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,038 $10,039 Implemented