Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,874

matching recommendations
Reset
NAICS 32311 Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0497 # 12 Y:2005 12 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $630 $0 Not Implemented
UU0091 # 01 Y:2005 01 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,270 $7,000 Not Implemented
UU0091 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,360 $420 Not Implemented
UU0091 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $330 $180 Not Implemented
UU0091 # 04 Y:2005 04 2005 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $250 $75 Not Implemented
UU0091 # 05 Y:2005 05 2005 OPTIMIZE PLANT POWER FACTOR $12,500 $15,290 Not Implemented
LE0223 # 01 Y:2005 01 2005 USE SOLAR HEAT TO MAKE ELECTRICTY $444,462 $1,100,000 Not Implemented
LE0223 # 02 Y:2005 02 2005 REPLACE BOILER $5,753 $74,500 Not Implemented
LE0223 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,650 $50 Implemented
LE0223 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,831 $2,500 Implemented
LE0223 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,281 $100 Implemented
LE0223 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,391 $250 Implemented
LE0223 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $844 $80 Implemented
LE0223 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $457 $1,000 Implemented
LE0223 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $375 $300 Implemented
LE0223 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,460 $0 Implemented
IA0369 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $464 $51 Not Implemented
IA0369 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,156 $40 Not Implemented
IA0369 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,908 $1,094 Not Implemented
IA0369 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,440 $1,650 Not Implemented
IA0369 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $265 $304 Not Implemented
IA0369 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $250 $349 Not Implemented
IA0369 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,035 $160 Not Implemented
IA0369 # 08 Y:2005 08 2005 REDUCE SCRAP PRODUCTION $49,000 $500 Not Implemented
IA0369 # 09 Y:2005 09 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $499,200 $800,000 Not Implemented