IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,649

matching recommendations
Reset
NAICS 323111 Commercial Printing (except Screen and Books)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0223 # 02 Y:2005 02 2005 REPLACE BOILER $5,753 $74,500 Not Implemented
LE0223 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,650 $50 Implemented
LE0223 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,831 $2,500 Implemented
LE0223 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,281 $100 Implemented
LE0223 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,391 $250 Implemented
LE0223 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $844 $80 Implemented
LE0223 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $457 $1,000 Implemented
LE0223 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $375 $300 Implemented
LE0223 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,460 $0 Implemented
IA0369 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $464 $51 Not Implemented
IA0369 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,156 $40 Not Implemented
IA0369 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,908 $1,094 Not Implemented
IA0369 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,440 $1,650 Not Implemented
IA0369 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $265 $304 Not Implemented
IA0369 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $250 $349 Not Implemented
IA0369 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,035 $160 Not Implemented
IA0369 # 08 Y:2005 08 2005 REDUCE SCRAP PRODUCTION $49,000 $500 Not Implemented
IA0369 # 09 Y:2005 09 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $499,200 $800,000 Not Implemented
IA0369 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,683 $20,487 Not Implemented
IA0369 # 11 Y:2005 11 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,703 $2,772 Not Implemented
IA0369 # 12 Y:2005 12 2005 INSTALL OCCUPANCY SENSORS $809 $2,233 Not Implemented
WV0322 # 01 Y:2005 01 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $26,224 $142,700 Not Implemented
WV0322 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $22,045 $4,322 Implemented
WV0322 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,250 $468 Implemented
WV0322 # 04 Y:2005 04 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,249 $9,180 Not Implemented