IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 324 Petroleum and Coal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0301 # 02 Y:2024 02 2024 CONTRACT A WOOD PALLET RECYCLING COMPANY $26,388 $3,600 n/a
IC0301 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,886 $205 n/a
IC0301 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,652 $0 n/a
IC0301 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,042 $205 n/a
IC0301 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,487 $0 n/a
IC0301 # 07 Y:2024 07 2024 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $13,766 $3,820 n/a
IC0301 # 08 Y:2024 08 2024 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $2,673 $890 n/a
IC0301 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $24,209 $186,605 n/a
MZ0054 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,678 $2,840 Not Implemented
MZ0054 # 05 Y:2010 05 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,942 $17,975 Not Implemented
MZ0054 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $60,827 $30,000 Not Implemented
MZ0054 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $24,485 $30,000 Not Implemented
MZ0054 # 02 Y:2010 02 2010 INSULATE BARE EQUIPMENT $3,852 $940 Not Implemented
MZ0054 # 01 Y:2010 01 2010 INSULATE BARE EQUIPMENT $2,366 $1,054 Not Implemented
BD0338 # 03 Y:2007 03 2007 DISCONNECT BALLASTS $2,472 $241 Not Implemented
BD0338 # 02 Y:2007 02 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,705 $751 Not Implemented
BD0338 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,227 $1,103 Not Implemented
BD0338 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $509 $2 Not Implemented
BD0338 # 05 Y:2007 05 2007 USE SYNTHETIC LUBRICANT $1,378 $2 Not Implemented
BD0338 # 07 Y:2007 07 2007 REPLACE BOILER $36,792 $110,001 Implemented
BD0338 # 08 Y:2007 08 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,864 $12,000 Not Implemented
BD0338 # 06 Y:2007 06 2007 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $369,530 $30,001 Not Implemented
IC0062 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,105 $0 Implemented
IC0062 # 06 Y:2003 06 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $20,526 $21,542 Implemented
IC0062 # 07 Y:2003 07 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $32,470 $28,470 Implemented