IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
NAICS 324 Petroleum and Coal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0731 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $550 $419 Not Implemented
OR0731 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,289 $1,924 Not Implemented
OR0731 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,777 $55 Not Implemented
OR0731 # 01 Y:2020 01 2020 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $400,247 $579,059 Not Implemented
OR0715 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $948 $0 Implemented
OR0715 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,204 $0 Implemented
OR0715 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,166 $71,155 Not Implemented
OR0715 # 01 Y:2019 01 2019 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,573 $5,513 Not Implemented
OR0713 # 01 Y:2018 01 2018 PURCHASE EQUIPMENT INSTEAD OF LEASING $219,819 $375,000 Not Implemented
OR0713 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,959 $10,959 Implemented
OR0713 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,594 $4,336 Implemented
OR0713 # 04 Y:2018 04 2018 UPGRADE CONTROLS ON COMPRESSORS $7,018 $26,371 Implemented
OR0713 # 05 Y:2018 05 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,108 $5,028 Implemented
OR0713 # 06 Y:2018 06 2018 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $929 $0 Implemented
OR0703 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,902 $12,504 Not Implemented
OR0703 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,525 $8,125 Implemented
OR0703 # 02 Y:2018 02 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,797 $13,333 Implemented
OR0703 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,955 $4,730 Implemented
OR0703 # 04 Y:2018 04 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,908 $12,825 Not Implemented
OR0642 # 05 Y:2015 05 2015 ADJUST BURNERS FOR EFFICIENT OPERATION $1,833 $500 Implemented
OR0642 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $898 $2,015 Implemented
OR0642 # 06 Y:2015 06 2015 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $64,347 $61,077 Not Implemented
OR0642 # 01 Y:2015 01 2015 MODIFY STARTUP/SHUTDOWN TIMES $6,091 $44,052 Implemented
OR0642 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,013 $24,232 Implemented
OR0642 # 03 Y:2015 03 2015 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $46,293 $100,000 Not Implemented