Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 324 | Petroleum and Coal Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0152 # 01 Y:2015 | 01 | 2015 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $49,150 | $85,250 | Not Implemented |
DL0152 # 02 Y:2015 | 02 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,300 | $34,100 | Not Implemented |
DL0152 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,290 | $69,750 | Implemented |
DL0152 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,330 | $164,300 | Implemented |
DL0152 # 05 Y:2015 | 05 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,400 | $46,500 | Not Implemented |
DL0152 # 06 Y:2015 | 06 | 2015 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $13,980 | $92,000 | Not Implemented |
DL0152 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,540 | $1,325,000 | Implemented |
OK0919 # 08 Y:2015 | 08 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,725 | $2,000 | Implemented |
OK0919 # 07 Y:2015 | 07 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,213 | $6,000 | Not Implemented |
OK0919 # 06 Y:2015 | 06 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $435 | $600 | Implemented |
OK0919 # 05 Y:2015 | 05 | 2015 | REPLACE BOILER | $10,468 | $22,000 | Not Implemented |
OK0919 # 04 Y:2015 | 04 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,498 | $3,000 | Implemented |
OK0919 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $815 | $3,390 | Implemented |
OK0919 # 02 Y:2015 | 02 | 2015 | USE PHOTOCELL CONTROLS | $2,030 | $1,790 | Not Implemented |
OK0919 # 01 Y:2015 | 01 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $758 | $1,688 | Implemented |
OK0919 # 09 Y:2015 | 09 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,124 | $5,120 | Implemented |
OK0919 # 10 Y:2015 | 10 | 2015 | INSTALL SET-BACK TIMERS | $1,991 | $100 | Implemented |
OK0919 # 11 Y:2015 | 11 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $208 | $210 | Not Implemented |
CO0701 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $19,610 | $20,000 | Implemented |
CO0701 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,230 | $2,460 | Implemented |
CO0701 # 03 Y:2015 | 03 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,920 | $3,750 | Implemented |
CO0701 # 01 Y:2015 | 01 | 2015 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $32,810 | $82,650 | Not Implemented |
OR0642 # 01 Y:2015 | 01 | 2015 | MODIFY STARTUP/SHUTDOWN TIMES | $6,091 | $44,052 | Implemented |
OR0642 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,013 | $24,232 | Implemented |
OR0642 # 03 Y:2015 | 03 | 2015 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $46,293 | $100,000 | Not Implemented |