IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

540

matching recommendations
Reset
NAICS 32412 Asphalt Paving, Roofing, and Saturated Materials Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0433 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,785 $9,062 Not Implemented
SF0433 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,718 $11,431 Not Implemented
SF0433 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $7,030 $21,402 Implemented
SF0433 # 06 Y:2013 06 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $9,806 $46,860 Implemented
SF0433 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,866 $32,002 Not Implemented
SU0335 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $20,297 $5,686 Not Implemented
SU0335 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $832 $386 Not Implemented
SU0335 # 03 Y:2013 03 2013 BURN A LESS EXPENSIVE GRADE OF FUEL $288,725 $218,600 Implemented
SU0335 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,709 $5,124 Implemented
SU0335 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $866 $2,820 Implemented
UM0416 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $625 $200 Not Implemented
UM0416 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $222 $450 Implemented
SD0453 # 01 Y:2012 01 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,250 $200 Implemented
SD0453 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $11,500 $200 Implemented
SD0453 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,950 $200 Implemented
SD0453 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,913 $2,000 Implemented
SD0453 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $49,200 $24,400 Implemented
SD0453 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,400 $25,600 Not Implemented
SD0453 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,700 $12,150 Implemented
UD0849 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62,282 $15,816 Not Implemented
UD0849 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,445 $0 Not Implemented
UD0849 # 03 Y:2012 03 2012 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $14,632 $0 Not Implemented
UD0849 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,199 $500 Not Implemented
UD0849 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,530 $1,000 Not Implemented
UD0849 # 06 Y:2012 06 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $34,045 $44,000 Not Implemented