IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0121 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $662 $23 Implemented
IP0121 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,721 $260 Implemented
IP0121 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $252 $476 Implemented
IP0121 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,800 $4,725 Implemented
IP0121 # 10 Y:2019 10 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,795 $17,400 Implemented
MZ0279 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,031 $4,700 Implemented
MZ0279 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,014 $640 Implemented
MZ0279 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,794 $6,252 Implemented
MZ0279 # 05 Y:2019 05 2019 RECOVER WASTE HEAT FROM EQUIPMENT $16,719 $14,400 Implemented
MZ0279 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $428 $1,464 Implemented
MZ0279 # 07 Y:2019 07 2019 INSTALL SPECTRAL REFLECTORS / DELAMP $19,835 $25,600 Implemented
CL1910 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,560 $23,063 Implemented
CL1910 # 02 Y:2019 02 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $2,189 $2,205 Implemented
CL1910 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,387 $1,900 Implemented
CL1910 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $377 $1,605 Implemented
AS0475 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,094 $5,938 Implemented
AS0475 # 03 Y:2019 03 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,779 $895 Implemented
AS0475 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $159 $752 Implemented
CL1909 # 02 Y:2019 02 2019 REPAIR AND ELIMINATE STEAM LEAKS $3,542 $2,040 Implemented
CL1909 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $647 $2,080 Implemented
CL1909 # 04 Y:2019 04 2019 PAY BILLS ON TIME TO AVOID LATE FEES $2,971 $0 Implemented
UF0532 # 01 Y:2019 01 2019 RECOVER WASTE HEAT FROM EQUIPMENT $40,174 $25,000 Implemented
UF0532 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,919 $1,400 Implemented
UF0532 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,352 $25,847 Implemented
UF0532 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,301 $421 Implemented