IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,329

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0537 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,987 $3,105 Implemented
WV0537 # 09 Y:2017 09 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,291 $25 Implemented
WV0537 # 10 Y:2017 10 2017 INSULATE BARE EQUIPMENT $1,909 $943 Implemented
WV0537 # 11 Y:2017 11 2017 DEVELOP A REPAIR/REPLACE POLICY $1,706 $678 Implemented
WV0537 # 13 Y:2017 13 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,149 $4,400 Implemented
WV0537 # 14 Y:2017 14 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $992 $631 Implemented
TT0187 # 02 Y:2017 02 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $52,000 $14,250 Implemented
TT0187 # 03 Y:2017 03 2017 UPGRADE CONTROLS ON COMPRESSORS $24,005 $30,000 Implemented
TT0187 # 04 Y:2017 04 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,000 $3,000 Implemented
TT0187 # 05 Y:2017 05 2017 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $8,095 $1,311 Implemented
TT0187 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,556 $0 Implemented
DL0171 # 03 Y:2016 03 2016 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $374 $0 Implemented
DL0171 # 07 Y:2016 07 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,885 $0 Implemented
DL0171 # 12 Y:2016 12 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $4,030 $0 Implemented
AM0718 # 04 Y:2016 04 2016 USE SYNTHETIC LUBRICANT $28,832 $0 Implemented
MA0762 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,741 $161,899 Implemented
MA0762 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,257 $19,975 Implemented
MA0762 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $49,046 $65,000 Implemented
MA0762 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,587 $19,980 Implemented
MA0762 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,640 $13,585 Implemented
WV0535 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $4,153 $511 Implemented
WV0535 # 03 Y:2016 03 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,206 $1,000 Implemented
WV0535 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $1,538 $578 Implemented
WV0535 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,622 $2,120 Implemented
WV0535 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $691 $30 Implemented