IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,389

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0397 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,391 $590 Implemented
UF0397 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $189 $0 Implemented
UF0397 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,305 $6,526 Implemented
UD0755 # 01 Y:2007 01 2007 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $73,500 $147,000 Implemented
UD0755 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,728 $10,396 Implemented
UD0755 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,952 $19,500 Implemented
UD0755 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $12,600 $15,000 Implemented
UD0755 # 09 Y:2007 09 2007 RECOVER WASTE HEAT FROM EQUIPMENT $11,340 $2,000 Implemented
UD0755 # 12 Y:2007 12 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,928 $42,500 Implemented
UF0396 # 09 Y:2007 09 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,300 $477 Implemented
UF0396 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,401 $0 Implemented
UF0396 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,101 $642 Implemented
UF0396 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $282 $609 Implemented
UF0396 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $347 $0 Implemented
UF0396 # 07 Y:2007 07 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $731 $810 Implemented
SD0391 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,231 $22,654 Implemented
SD0391 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,478 $11,028 Implemented
UD0753 # 01 Y:2007 01 2007 DEVELOP STANDARD OPERATING PROCEDURES $98,450 $3,040 Implemented
UD0753 # 02 Y:2007 02 2007 REDUCE VENTILATION AIR $67,600 $19,800 Implemented
UD0753 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $11,994 $7,875 Implemented
UD0753 # 06 Y:2007 06 2007 USE RADIANT HEATER FOR SPOT HEATING $10,800 $15,600 Implemented
UD0753 # 07 Y:2007 07 2007 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $8,390 $15,000 Implemented
UD0753 # 09 Y:2007 09 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,816 $0 Implemented
UD0753 # 11 Y:2007 11 2007 USE OPTIMUM TEMPERATURE $998 $0 Implemented
SF0337 # 01 Y:2007 01 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,667 $0 Implemented