Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,748
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0226 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $50,061 | $47,500 | Implemented |
LE0226 # 06 Y:2006 | 06 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $14,515 | $800 | Implemented |
LE0226 # 07 Y:2006 | 07 | 2006 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $8,946 | $16,000 | Not Implemented |
LE0226 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,760 | $500 | Implemented |
NC0332 # 01 Y:2006 | 01 | 2006 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $20,455 | $12,000 | Not Implemented |
NC0332 # 02 Y:2006 | 02 | 2006 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $39,950 | $210,000 | Not Implemented |
NC0332 # 03 Y:2006 | 03 | 2006 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $17,210 | $28,200 | Not Implemented |
NC0332 # 04 Y:2006 | 04 | 2006 | INSULATE FEEDWATER TANK | $389 | $277 | Not Implemented |
NC0332 # 05 Y:2006 | 05 | 2006 | INSULATE BARE EQUIPMENT | $406 | $86 | Not Implemented |
MA0596 # 01 Y:2006 | 01 | 2006 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $50,414 | $4,000 | Implemented |
MA0596 # 02 Y:2006 | 02 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,617 | $75,860 | Implemented |
MA0596 # 03 Y:2006 | 03 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,740 | $5,440 | Implemented |
MA0596 # 04 Y:2006 | 04 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $9,148 | $4,500 | Implemented |
MA0596 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,400 | $37,895 | Implemented |
MA0596 # 06 Y:2006 | 06 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,195 | $13,000 | Implemented |
MA0596 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $4,855 | $8,000 | Implemented |
MA0596 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,870 | $18,200 | Not Implemented |
MA0596 # 09 Y:2006 | 09 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,026 | $5,350 | Implemented |
MA0596 # 10 Y:2006 | 10 | 2006 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,415 | $9,840 | Implemented |
MA0596 # 11 Y:2006 | 11 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $458 | $0 | Not Implemented |
MA0596 # 12 Y:2006 | 12 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $360 | $900 | Not Implemented |
IC0112 # 01 Y:2006 | 01 | 2006 | REPLACE BOILER | $300,562 | $414,240 | Not Implemented |
IC0112 # 02 Y:2006 | 02 | 2006 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $57,168 | $11,016 | Implemented |
IC0112 # 03 Y:2006 | 03 | 2006 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $44,296 | $145,126 | Implemented |
IC0112 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,495 | $66,129 | Not Implemented |