Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,556
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0095 # 04 Y:2005 | 04 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $376 | $0 | Not Implemented |
LM0095 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $1,202 | $750 | Not Implemented |
LM0095 # 06 Y:2005 | 06 | 2005 | INCREASE AMOUNT OF CONDENSATE RETURNED | $67,226 | $100,000 | Not Implemented |
LM0095 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $749 | $100 | Implemented |
LM0095 # 08 Y:2005 | 08 | 2005 | MODIFY STARTUP/SHUTDOWN TIMES | $101,277 | $1,000 | Implemented |
LM0095 # 09 Y:2005 | 09 | 2005 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $115,000 | $3,000 | Implemented |
LM0095 # 10 Y:2005 | 10 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $23,750 | $1,000 | Implemented |
LM0095 # 11 Y:2005 | 11 | 2005 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $46,875 | $50,000 | Implemented |
LM0095 # 12 Y:2005 | 12 | 2005 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $50,000 | $50,000 | Not Implemented |
MA0573 # 01 Y:2005 | 01 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $15,507 | $6,435 | Implemented |
MA0573 # 02 Y:2005 | 02 | 2005 | REPLACE BOILER | $5,500 | $15,900 | Not Implemented |
MA0573 # 03 Y:2005 | 03 | 2005 | OPTIMIZE PLANT POWER FACTOR | $5,270 | $5,200 | Not Implemented |
MA0573 # 04 Y:2005 | 04 | 2005 | INSULATE BARE EQUIPMENT | $2,868 | $3,920 | Implemented |
LM0093 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,607 | $475 | Implemented |
LM0093 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,940 | $0 | Not Implemented |
LM0093 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $903 | $200 | Not Implemented |
LM0093 # 04 Y:2005 | 04 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,570 | $150 | Not Implemented |
LM0093 # 05 Y:2005 | 05 | 2005 | MODIFY WORKLOAD | $32,448 | $300 | Not Implemented |
LE0208 # 01 Y:2005 | 01 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $214,649 | $548,400 | Not Implemented |
LE0208 # 02 Y:2005 | 02 | 2005 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $30,000 | $2,500 | Implemented |
LE0208 # 03 Y:2005 | 03 | 2005 | MOVE PRODUCT USING MECHANICAL MEANS | $25,000 | $460 | Implemented |
LE0208 # 04 Y:2005 | 04 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,745 | $1,250 | Implemented |
LE0208 # 05 Y:2005 | 05 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,758 | $2,500 | Implemented |
LE0208 # 06 Y:2005 | 06 | 2005 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $3,676 | $1,000 | Implemented |
LE0208 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,869 | $750 | Implemented |