IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0095 # 04 Y:2005 04 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $376 $0 Not Implemented
LM0095 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,202 $750 Not Implemented
LM0095 # 06 Y:2005 06 2005 INCREASE AMOUNT OF CONDENSATE RETURNED $67,226 $100,000 Not Implemented
LM0095 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN WATER LINES AND VALVES $749 $100 Implemented
LM0095 # 08 Y:2005 08 2005 MODIFY STARTUP/SHUTDOWN TIMES $101,277 $1,000 Implemented
LM0095 # 09 Y:2005 09 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $115,000 $3,000 Implemented
LM0095 # 10 Y:2005 10 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $23,750 $1,000 Implemented
LM0095 # 11 Y:2005 11 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $46,875 $50,000 Implemented
LM0095 # 12 Y:2005 12 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $50,000 $50,000 Not Implemented
MA0573 # 01 Y:2005 01 2005 INSTALL TIMERS AND/OR THERMOSTATS $15,507 $6,435 Implemented
MA0573 # 02 Y:2005 02 2005 REPLACE BOILER $5,500 $15,900 Not Implemented
MA0573 # 03 Y:2005 03 2005 OPTIMIZE PLANT POWER FACTOR $5,270 $5,200 Not Implemented
MA0573 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $2,868 $3,920 Implemented
LM0093 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,607 $475 Implemented
LM0093 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,940 $0 Not Implemented
LM0093 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $903 $200 Not Implemented
LM0093 # 04 Y:2005 04 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,570 $150 Not Implemented
LM0093 # 05 Y:2005 05 2005 MODIFY WORKLOAD $32,448 $300 Not Implemented
LE0208 # 01 Y:2005 01 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $214,649 $548,400 Not Implemented
LE0208 # 02 Y:2005 02 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $30,000 $2,500 Implemented
LE0208 # 03 Y:2005 03 2005 MOVE PRODUCT USING MECHANICAL MEANS $25,000 $460 Implemented
LE0208 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,745 $1,250 Implemented
LE0208 # 05 Y:2005 05 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,758 $2,500 Implemented
LE0208 # 06 Y:2005 06 2005 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,676 $1,000 Implemented
LE0208 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,869 $750 Implemented