Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,567
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0093 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,940 | $0 | Not Implemented |
LM0093 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $903 | $200 | Not Implemented |
LM0093 # 04 Y:2005 | 04 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,570 | $150 | Not Implemented |
LM0093 # 05 Y:2005 | 05 | 2005 | MODIFY WORKLOAD | $32,448 | $300 | Not Implemented |
LE0208 # 01 Y:2005 | 01 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $214,649 | $548,400 | Not Implemented |
LE0208 # 02 Y:2005 | 02 | 2005 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $30,000 | $2,500 | Implemented |
LE0208 # 03 Y:2005 | 03 | 2005 | MOVE PRODUCT USING MECHANICAL MEANS | $25,000 | $460 | Implemented |
LE0208 # 04 Y:2005 | 04 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,745 | $1,250 | Implemented |
LE0208 # 05 Y:2005 | 05 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,758 | $2,500 | Implemented |
LE0208 # 06 Y:2005 | 06 | 2005 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $3,676 | $1,000 | Implemented |
LE0208 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,869 | $750 | Implemented |
LE0208 # 08 Y:2005 | 08 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,927 | $450 | Not Implemented |
LE0208 # 09 Y:2005 | 09 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,060 | $145 | Implemented |
MA0570 # 01 Y:2005 | 01 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,944 | $79,014 | Not Implemented |
MA0570 # 02 Y:2005 | 02 | 2005 | INSULATE BARE EQUIPMENT | $27,226 | $1,624 | Implemented |
MA0570 # 03 Y:2005 | 03 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $20,028 | $21,736 | Implemented |
MA0570 # 04 Y:2005 | 04 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,182 | $20,800 | Not Implemented |
MA0570 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,127 | $30,357 | Implemented |
MA0570 # 06 Y:2005 | 06 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,432 | $32,499 | Not Implemented |
MA0570 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,365 | $0 | Implemented |
MA0570 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,708 | $7,000 | Implemented |
MA0570 # 09 Y:2005 | 09 | 2005 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,891 | $200 | Not Implemented |
MA0570 # 10 Y:2005 | 10 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $960 | $600 | Implemented |
IC0089 # 01 Y:2004 | 01 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $67,444 | $15,000 | Not Implemented |
IC0089 # 02 Y:2004 | 02 | 2004 | RECOVER MECHANICAL ENERGY | $11,613 | $3,600 | Not Implemented |