Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,556
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0056 # 08 Y:2003 | 08 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,180 | $4,206 | Not Implemented |
IC0056 # 09 Y:2003 | 09 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,770 | $2,052 | Not Implemented |
IC0056 # 10 Y:2003 | 10 | 2003 | INSULATE BARE EQUIPMENT | $2,293 | $683 | Not Implemented |
IC0056 # 11 Y:2003 | 11 | 2003 | INSULATE BARE EQUIPMENT | $1,329 | $400 | Not Implemented |
LL0154 # 01 Y:2003 | 01 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $18,488,939 | $413,700 | n/a |
LL0154 # 02 Y:2003 | 02 | 2003 | INCREASE AMOUNT OF CONDENSATE RETURNED | $11,340,034 | $773,535 | n/a |
LL0154 # 03 Y:2003 | 03 | 2003 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $6,313,507 | $750,000 | Not Implemented |
LL0154 # 04 Y:2003 | 04 | 2003 | REDUCE EXCESS STEAM BLEEDING | $504,716 | $45,360 | Not Implemented |
LL0154 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $109,742 | $60,716 | Implemented |
LL0154 # 06 Y:2003 | 06 | 2003 | USE PHOTOCELL CONTROLS | $36,675 | $4,100 | Not Implemented |
LL0154 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $11,082 | $2,865 | Not Implemented |
SU0159 # 01 Y:2003 | 01 | 2003 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $5,869 | $18,122 | Not Implemented |
SU0159 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,575 | $15,750 | Not Implemented |
SU0159 # 03 Y:2003 | 03 | 2003 | USE SYNTHETIC LUBRICANT | $1,187 | $800 | Implemented |
SU0159 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,171 | $0 | Implemented |
SU0159 # 05 Y:2003 | 05 | 2003 | REPLACE BOILER | $1,148 | $13,507 | Implemented |
SU0159 # 06 Y:2003 | 06 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,028 | $0 | Implemented |
SU0159 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $276 | $523 | Implemented |
IA0314 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,950 | $267 | Implemented |
IA0314 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $872 | $30 | Implemented |
IA0314 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $766 | $130 | Not Implemented |
IA0314 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $443 | $238 | Implemented |
IA0314 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,483 | $26,776 | Not Implemented |
IA0314 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,549 | $7,100 | Not Implemented |
IA0314 # 07 Y:2003 | 07 | 2003 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $491 | $520 | Implemented |