Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
159
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0470 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $671 | $1,100 | Implemented |
NC0470 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,336 | $1,200 | Implemented |
NC0470 # 02 Y:2012 | 02 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $11,916 | $18,000 | Not Implemented |
NC0470 # 01 Y:2012 | 01 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,179 | $0 | Implemented |
NC0464 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $87,056 | $77,718 | Implemented |
NC0464 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,873 | $35,445 | Implemented |
NC0464 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $79 | $110 | Implemented |
NC0464 # 05 Y:2012 | 05 | 2012 | REDESIGN PROCESS | $2,832 | $1,000 | Not Implemented |
NC0464 # 04 Y:2012 | 04 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $42,271 | $58,000 | Not Implemented |
NC0461 # 08 Y:2012 | 08 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $458,904 | $314,375 | Implemented |
NC0461 # 07 Y:2012 | 07 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $41,556 | $15,000 | Not Implemented |
NC0461 # 06 Y:2012 | 06 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $4,695 | $0 | Implemented |
NC0461 # 05 Y:2012 | 05 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $84,150 | $40,000 | Implemented |
NC0461 # 04 Y:2012 | 04 | 2012 | ADJUST BURNERS FOR EFFICIENT OPERATION | $24,541 | $2,400 | Implemented |
NC0461 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $81,960 | $300,000 | Not Implemented |
NC0461 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,912 | $7,160 | Implemented |
NC0461 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $163,689 | $410,000 | Not Implemented |
NC0456 # 05 Y:2012 | 05 | 2012 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,045 | $5,000 | Not Implemented |
NC0456 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $36,693 | $65,000 | Not Implemented |
NC0456 # 02 Y:2012 | 02 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $34,238 | $5,500 | Implemented |
NC0456 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $997 | $100 | Implemented |
NC0456 # 03 Y:2012 | 03 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $28,806 | $60,000 | Not Implemented |
NC0443 # 01 Y:2012 | 01 | 2012 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $24,834 | $105,200 | Not Implemented |
NC0443 # 02 Y:2012 | 02 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,610 | $27,000 | Not Implemented |
NC0443 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,514 | $500 | Not Implemented |