IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

268

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0532 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,301 $421 Implemented
UF0532 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $1,094 $230 Not Implemented
UF0532 # 07 Y:2019 07 2019 REDUCE OR ELIMINATE WASTE $19,196 $40,500 Implemented
AS0472 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $95,737 $8,636 Not Implemented
AS0472 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $20,091 $41,520 Not Implemented
AS0472 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,102 $53,286 Not Implemented
AS0472 # 04 Y:2019 04 2019 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $4,878 $6,000 Not Implemented
AS0472 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,692 $770 Implemented
IP0119 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $768 $28 Not Implemented
IP0119 # 02 Y:2019 02 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,920 $460 Not Implemented
IP0119 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,082 $379 Not Implemented
IP0119 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,002 $875 Implemented
IP0119 # 05 Y:2019 05 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $27,937 $38,052 Implemented
IP0119 # 06 Y:2019 06 2019 REPLACE BOILER $20,712 $66,681 Implemented
UF0530 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $94,823 $80,000 Implemented
UF0530 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $60,494 $202,420 Implemented
UF0530 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $47,739 $25,000 Implemented
UF0530 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $43,693 $25,000 Implemented
UF0530 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,859 $22,491 Not Implemented
UF0530 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,402 $0 Implemented
UF0530 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,876 $421 Implemented
UF0530 # 08 Y:2019 08 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,535 $5,998 Not Implemented
UF0530 # 09 Y:2019 09 2019 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $1,181 $2,000 Not Implemented
WV0579 # 01 Y:2019 01 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $95,486 $76,000 Not Implemented
WV0579 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,379 $3,500 Implemented