Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,567
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1603 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $89,730 | $85,358 | Implemented |
UK1603 # 02 Y:2016 | 02 | 2016 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,306 | $1,445 | Not Implemented |
UK1603 # 03 Y:2016 | 03 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,272 | $35,000 | Implemented |
UK1603 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,160 | $14,700 | Implemented |
UK1603 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,058 | $0 | Not Implemented |
UK1603 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,304 | $1,600 | Implemented |
UK1603 # 07 Y:2016 | 07 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16,948 | $0 | Implemented |
UK1603 # 08 Y:2016 | 08 | 2016 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $33,264 | $30,000 | Not Implemented |
UK1603 # 09 Y:2016 | 09 | 2016 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $33,165 | $58,682 | Implemented |
UK1603 # 10 Y:2016 | 10 | 2016 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,457 | $0 | Implemented |
WM0088 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $71,275 | $132,797 | Not Implemented |
WM0088 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $75,376 | $50,000 | Not Implemented |
WM0088 # 03 Y:2016 | 03 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,940 | $28,000 | Not Implemented |
WM0088 # 04 Y:2016 | 04 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,075 | $501 | Not Implemented |
WM0088 # 05 Y:2016 | 05 | 2016 | METER WASTE WATER | $4,267 | $375 | Not Implemented |
WM0088 # 06 Y:2016 | 06 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,245 | $0 | Implemented |
WM0088 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,531 | $6,000 | Not Implemented |
NC0569 # 01 Y:2016 | 01 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $68,453 | $280,000 | Not Implemented |
NC0569 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,493 | $48,500 | Not Implemented |
NC0569 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,986 | $18,150 | Implemented |
NC0569 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,698 | $200 | Implemented |
NC0569 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,208 | $33,756 | Implemented |
NC0569 # 06 Y:2016 | 06 | 2016 | USE PHOTOCELL CONTROLS | $423 | $150 | Implemented |
NC0569 # 07 Y:2016 | 07 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $2,230 | $4,256 | Implemented |
NC0569 # 08 Y:2016 | 08 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,856 | $230 | Not Implemented |