IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,567

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0144 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $14,166 $5,000 Implemented
TT0144 # 02 Y:2014 02 2014 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $26,051 $22,000 Implemented
TT0144 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,000 $20,000 Not Implemented
TT0144 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,000 $10,000 Not Implemented
TT0144 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,639 $4,000 Implemented
TT0144 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,695 $30,000 Not Implemented
TT0144 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,301 $50,000 Not Implemented
TT0144 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,212 $30,000 Not Implemented
TT0144 # 09 Y:2014 09 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,030 $30,000 Not Implemented
TT0144 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,775 $30,000 Not Implemented
TT0144 # 11 Y:2014 11 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,435 $25,000 Not Implemented
TT0144 # 12 Y:2014 12 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,105 $25,000 Not Implemented
TT0144 # 13 Y:2014 13 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,928 $30,000 Not Implemented
TT0144 # 14 Y:2014 14 2014 USE PHOTOCELL CONTROLS $49,879 $7,350 Not Implemented
TT0144 # 15 Y:2014 15 2014 INSTALL OCCUPANCY SENSORS $3,094 $1,691 Not Implemented
TT0144 # 16 Y:2014 16 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $18,840 $25,000 Not Implemented
DL0134 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,000 $33,600 Implemented
DL0134 # 02 Y:2014 02 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $41,430 $54,000 Implemented
DL0134 # 03 Y:2014 03 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,580 $0 Implemented
DL0134 # 04 Y:2014 04 2014 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $4,630 $5,700 Not Implemented
DL0134 # 05 Y:2014 05 2014 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $54,210 $28,110 Not Implemented
DL0134 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,090 $10,500 Not Implemented
DL0134 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,200 $13,590 Not Implemented
DL0134 # 08 Y:2014 08 2014 METER WASTE WATER $8,610 $8,200 Implemented
CO0696 # 01 Y:2014 01 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $9,930 $22,200 Not Implemented