Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1060 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,541 $11,594 Not Implemented
OK1060 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $445 $1,989 Not Implemented
OK1060 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $471 $0 Implemented
OK1060 # 04 Y:2022 04 2022 INSTALL SUB-METERING EQUIPMENT $2,400 $992 Not Implemented
OK1060 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $352 $1,500 Not Implemented
OK1048 # 05 Y:2021 05 2021 OPTIMIZE PLANT POWER FACTOR $22,294 $15,000 Not Implemented
OK1048 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $2,257 $3,150 Implemented
OK1048 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,475 $13,356 Implemented
OK1048 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,153 $4,000 Not Implemented
OK1048 # 01 Y:2021 01 2021 REPAIR AND ELIMINATE STEAM LEAKS $37,041 $2,860 Implemented
OK1046 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $569 $512 Not Implemented
OK1046 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,027 $38,688 Implemented
OK1046 # 04 Y:2021 04 2021 OPTIMIZE PLANT POWER FACTOR $2,125 $8,240 Not Implemented
OK1046 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $827 $0 Implemented
OK1046 # 01 Y:2021 01 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,296 $2,422 Not Implemented
OK1015 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,383 $12,752 Not Implemented
OK1015 # 03 Y:2019 03 2019 INSTALL SET-BACK TIMERS $320 $200 Implemented
OK1015 # 04 Y:2019 04 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $380 $435 Not Implemented
OK1015 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,577 $17,500 Not Implemented
OK1015 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $427 $2,045 Implemented
OK0969 # 08 Y:2017 08 2017 INSTALL SET-BACK TIMERS $396 $148 Not Implemented
OK0969 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,730 $42,000 Not Implemented
OK0969 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,000 $48,139 Implemented
OK0969 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $532 $4,727 Not Implemented
OK0969 # 04 Y:2017 04 2017 REPAIR AND ELIMINATE STEAM LEAKS $12,697 $2,712 Not Implemented