Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
159
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0383 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,327 | $2,436 | Implemented |
MI0383 # 04 Y:2020 | 04 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,698 | $1,306 | Implemented |
MI0383 # 03 Y:2020 | 03 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,976 | $1,428 | Implemented |
MI0383 # 02 Y:2020 | 02 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,548 | $480 | Not Implemented |
MI0383 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO HEAT WATER | $10,293 | $12,280 | Implemented |
MI0383 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $552 | $882 | Implemented |
UF0558 # 04 Y:2020 | 04 | 2020 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $1,517,489 | $143,275 | Implemented |
UF0558 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,420 | $456 | Implemented |
UF0558 # 05 Y:2020 | 05 | 2020 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $40,098 | $110,800 | Implemented |
UF0558 # 03 Y:2020 | 03 | 2020 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $42,983 | $7,127 | Implemented |
UF0558 # 01 Y:2020 | 01 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,597 | $19,045 | Implemented |
MI0380 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $1,277 | $853 | Not Implemented |
MI0380 # 02 Y:2020 | 02 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,433 | $12,201 | Implemented |
MI0380 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO HEAT WATER | $17,031 | $8,409 | Implemented |
MI0380 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,753 | $3,280 | Implemented |
MI0380 # 08 Y:2020 | 08 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $421 | $1,231 | Not Implemented |
MI0380 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $568 | $120 | Implemented |
MI0380 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,175 | $1,980 | Implemented |
MI0380 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,272 | $11,460 | Implemented |
NC0654 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,303 | $20,000 | Not Implemented |
NC0654 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,735 | $130,000 | Not Implemented |
NC0654 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,030 | $75,000 | Not Implemented |
NC0654 # 04 Y:2020 | 04 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,543 | $6,700 | Not Implemented |
NC0654 # 01 Y:2020 | 01 | 2020 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,381,024 | $8,000,000 | Not Implemented |
UD1024 # 04 Y:2020 | 04 | 2020 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $15,421 | $0 | Not Implemented |