IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

995

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0403 # 05 Y:2010 05 2010 USE RADIANT HEATER FOR SPOT HEATING $4,543 $20,500 Not Implemented
WV0403 # 06 Y:2010 06 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,610 $8,756 Not Implemented
WV0403 # 07 Y:2010 07 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,357 $8,600 Not Implemented
WV0403 # 08 Y:2010 08 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,342 $10,700 Not Implemented
WV0403 # 09 Y:2010 09 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,274 $1,620 Implemented
WV0403 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,238 $110 Implemented
WV0403 # 11 Y:2010 11 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,180 $748 Implemented
CO0635 # 01 Y:2010 01 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $21,490 $12,290 Not Implemented
CO0635 # 02 Y:2010 02 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,520 $10,350 Not Implemented
CO0635 # 03 Y:2010 03 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,100 $1,510 Not Implemented
CO0635 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,170 $11,190 Not Implemented
CO0635 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,050 $4,130 Implemented
CO0635 # 06 Y:2010 06 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,760 $10,240 Not Implemented
MZ0042 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,975 $4,500 Not Implemented
MZ0042 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $19,660 $18,000 Not Implemented
MZ0042 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $905 $905 Not Implemented
MZ0042 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,970 $214,200 Not Implemented
MZ0042 # 05 Y:2009 05 2009 CONDENSE OPERATION INTO ONE BUILDING $543,300 $150,000 Implemented
NC0394 # 01 Y:2009 01 2009 INSULATE BARE EQUIPMENT $22,190 $6,149 Not Implemented
NC0394 # 02 Y:2009 02 2009 DEVELOP A REPAIR/REPLACE POLICY $5,639 $7,629 Not Implemented
NC0394 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,706 $19,737 Not Implemented
NC0394 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,909 $6,600 Not Implemented
NC0394 # 05 Y:2009 05 2009 RECOVER AND REUSE COOLING WATER $4,517 $3,850 Not Implemented
MI0180 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $62,188 $3,320 Implemented
MI0180 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $51,365 $2,000 Implemented