Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
995
matching recommendationsNAICS | 3251 | Basic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0704 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $668 | $700 | Implemented |
UD0704 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $652 | $300 | Not Implemented |
UD0704 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $504 | $0 | Implemented |
UD0704 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $223 | $500 | Implemented |
GT0790 # 01 Y:2004 | 01 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $160 | $300 | Not Implemented |
GT0790 # 02 Y:2004 | 02 | 2004 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $3,294 | $21,890 | Not Implemented |
GT0790 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $809 | $1,970 | Implemented |
GT0790 # 04 Y:2004 | 04 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $130 | $200 | Not Implemented |
GT0790 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $2,365 | $3,895 | Not Implemented |
GT0790 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $83,000 | $300,000 | Not Implemented |
GT0790 # 07 Y:2004 | 07 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,972 | $0 | Implemented |
UM0254 # 01 Y:2004 | 01 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $31,255 | $30,000 | Not Implemented |
UM0254 # 02 Y:2004 | 02 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,650 | $2,200 | Implemented |
UM0254 # 03 Y:2004 | 03 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,907 | $0 | Implemented |
UM0254 # 04 Y:2004 | 04 | 2004 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,584 | $15,000 | Not Implemented |
UM0254 # 05 Y:2004 | 05 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,267 | $10,000 | Not Implemented |
UM0254 # 06 Y:2004 | 06 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,010 | $1,080 | Implemented |
UM0254 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,479 | $1,038 | Implemented |
OR0455 # 01 Y:2004 | 01 | 2004 | RECOVER AND REUSE WASTE MATERIAL | $45,100 | $16,200 | Implemented |
OR0455 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,570 | $0 | Implemented |
OR0455 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,670 | $6,670 | Not Implemented |
OR0455 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $2,140 | $1,750 | Implemented |
OR0455 # 05 Y:2004 | 05 | 2004 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $1,420 | $150 | Implemented |
OR0455 # 06 Y:2004 | 06 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,510 | $790 | Not Implemented |
UM0243 # 01 Y:2003 | 01 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $142,452 | $31,500 | Implemented |