IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0143 # 02 Y:2015 02 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,928 $0 Implemented
DL0143 # 06 Y:2015 06 2015 INSTALL TIMERS AND/OR THERMOSTATS $1,582 $3,000 Implemented
DL0143 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $855 $0 Implemented
DL0143 # 01 Y:2015 01 2015 REDUCE VENTILATION AIR $12,970 $0 Implemented
LE0371 # 14 Y:2014 14 2014 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,091 $4,140 Implemented
LE0371 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,001 $14 Implemented
LE0371 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,667 $28 Implemented
LE0371 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $941 $1,000 Implemented
WV0450 # 07 Y:2012 07 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $11,389 $6,500 Implemented
WV0450 # 11 Y:2012 11 2012 DEVELOP A REPAIR/REPLACE POLICY $8,489 $1,210 Implemented
WV0450 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,953 $18,267 Implemented
WV0450 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $130,899 $157,320 Implemented
WV0450 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $173,557 $1,000 Implemented
WV0403 # 11 Y:2010 11 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,180 $748 Implemented
WV0403 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,238 $110 Implemented
WV0403 # 09 Y:2010 09 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,274 $1,620 Implemented
WV0403 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,231 $70,410 Implemented
WV0403 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,050 $52,453 Implemented
WV0403 # 01 Y:2010 01 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $45,685 $55,000 Implemented
DL0013 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,300 $0 Implemented
DL0013 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $2,396 $285 Implemented
DL0013 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $108,300 $104,800 Implemented
DL0013 # 04 Y:2008 04 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $24,218 $25,000 Implemented
DL0013 # 05 Y:2008 05 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,700 $10,000 Implemented
LE0247 # 04 Y:2006 04 2006 $24,012 $20,000 Implemented