Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
38
matching recommendationsNAICS | 3251 | Basic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0611 # 02 Y:2013 | 02 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $8,684 | $5,600 | Not Implemented |
OR0611 # 01 Y:2013 | 01 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,437 | $0 | Not Implemented |
OR0611 # 08 Y:2013 | 08 | 2013 | INSULATE BARE EQUIPMENT | $922 | $2,134 | Not Implemented |
OR0611 # 07 Y:2013 | 07 | 2013 | AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK | $1,200 | $5,464 | Not Implemented |
OR0611 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,410 | $3,724 | Not Implemented |
OR0611 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $2,436 | $2,159 | Not Implemented |
OR0611 # 04 Y:2013 | 04 | 2013 | UPGRADE OBSOLETE EQUIPMENT | $5,340 | $11,938 | Not Implemented |
OR0611 # 03 Y:2013 | 03 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $7,909 | $37,830 | Not Implemented |
NC0490 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $633 | $50 | Implemented |
NC0490 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,689 | $7,449 | Not Implemented |
NC0490 # 09 Y:2013 | 09 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,135 | $2,192 | Implemented |
NC0490 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $213 | $381 | Implemented |
NC0490 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,248 | $4,989 | Implemented |
NC0490 # 05 Y:2013 | 05 | 2013 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $15,690 | $65,000 | Implemented |
NC0490 # 08 Y:2013 | 08 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $3,207 | $5,500 | Implemented |
NC0490 # 07 Y:2013 | 07 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $1,508 | $1,217 | Implemented |
NC0490 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $2,692 | $1,922 | Not Implemented |
MA0711 # 02 Y:2013 | 02 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,430 | $25,000 | Not Implemented |
MA0711 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,618 | $35,000 | Not Implemented |
MA0711 # 03 Y:2013 | 03 | 2013 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $6,314 | $14,000 | Not Implemented |
MA0711 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,170 | $2,000 | Implemented |
MA0711 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,165 | $4,055 | Implemented |
UD0881 # 06 Y:2013 | 06 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,640 | $6,800 | Implemented |
UD0881 # 05 Y:2013 | 05 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,823 | $1,200 | Implemented |
UD0881 # 04 Y:2013 | 04 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $1,024 | $1,525 | Implemented |