IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
NAICS 325130 Synthetic Dye and Pigment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0326 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $1,062,600 $94 Implemented
MS0326 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,624 $376 Implemented
MS0326 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $14,110 $500 Implemented
UM0306 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,385 $2,500 Implemented
UM0306 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $11,812 $22,458 Not Implemented
UM0306 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,558 $197 Implemented
UM0306 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,482 $2,429 Not Implemented
UM0306 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,571 $9,421 Implemented
UM0306 # 04 Y:2006 04 2006 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $8,336 $7,520 Implemented
UM0306 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,934 $2,500 Not Implemented
LE0215 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,755 $600 Not Implemented
LE0215 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $99,127 $115,500 Implemented
LE0215 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $30,899 $320 Not Implemented
LE0215 # 03 Y:2005 03 2005 BURN WASTE OIL FOR HEAT $11,172 $3,000 Not Implemented
LE0215 # 04 Y:2005 04 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,220 $1,588 Implemented
LE0215 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $4,903 $5,000 Not Implemented
LE0215 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,894 $480 Not Implemented
LE0215 # 07 Y:2005 07 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,801 $2,000 Not Implemented
UD0704 # 03 Y:2004 03 2004 UPGRADE CONTROLS ON COMPRESSORS $846 $900 Implemented
UD0704 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $668 $700 Implemented
UD0704 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $652 $300 Not Implemented
UD0704 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $504 $0 Implemented
UD0704 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $223 $500 Implemented
UD0704 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $3,335 $6,000 Not Implemented
UD0704 # 01 Y:2004 01 2004 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,368 $0 Implemented