Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsNAICS | 32519 | Other Basic Organic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UMS011 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $40,000 | $40,000 | Not Implemented |
UMS011 # 05 Y:2012 | 05 | 2012 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $100,000 | $200,000 | Not Implemented |
UMS011 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,224,000 | $1,300,000 | Not Implemented |
UMS011 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $275,000 | $500,000 | Not Implemented |
UMS011 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $196,000 | $300,000 | Not Implemented |
UMS011 # 04 Y:2012 | 04 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $113,000 | $70,000 | Not Implemented |
UMS007 # 01 Y:2012 | 01 | 2012 | OPERATE BOILERS ON HIGH FIRE SETTING | $1,630,000 | $0 | Not Implemented |
UMS007 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $480,000 | $800,000 | Implemented |
UMS007 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $157,000 | $200,000 | Not Implemented |
UMS007 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $85,000 | $100,000 | Not Implemented |
UMS005 # 02 Y:2012 | 02 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $107,000 | $50,000 | Not Implemented |
UMS005 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $305,000 | $300,000 | Not Implemented |
UMS005 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,330,000 | $1,500,000 | Not Implemented |
UM0254 # 01 Y:2004 | 01 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $31,255 | $30,000 | Not Implemented |
UM0254 # 02 Y:2004 | 02 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,650 | $2,200 | Implemented |
UM0254 # 03 Y:2004 | 03 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,907 | $0 | Implemented |
UM0254 # 04 Y:2004 | 04 | 2004 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,584 | $15,000 | Not Implemented |
UM0254 # 05 Y:2004 | 05 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,267 | $10,000 | Not Implemented |
UM0254 # 06 Y:2004 | 06 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,010 | $1,080 | Implemented |
UM0254 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,479 | $1,038 | Implemented |