IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 32519 Other Basic Organic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0651 # 08 Y:2014 08 2014 INSULATE FEEDWATER TANK $290 $320 Not Implemented
AM0651 # 07 Y:2014 07 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,630 $1,452 Not Implemented
AM0651 # 06 Y:2014 06 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,950 $0 Implemented
AM0651 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,725 $500 Implemented
AM0651 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,745 $735 Implemented
AM0651 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,180 $1,500 Implemented
AM0651 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $8,525 $400 Implemented
AM0651 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $8,615 $1,485 Implemented
AM0594 # 01 Y:2011 01 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $74,000 $26,000 Not Implemented
AM0594 # 02 Y:2011 02 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,850 $0 Implemented
AM0594 # 03 Y:2011 03 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,246 $180 Not Implemented
AM0594 # 04 Y:2011 04 2011 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON $1,150 $0 Not Implemented
AM0594 # 05 Y:2011 05 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $650 $270 Implemented
AM0594 # 06 Y:2011 06 2011 USE SYNTHETIC LUBRICANT $393 $0 Not Implemented
OK0718 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,021 $40,875 Not Implemented
OK0718 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,226 $66,500 Implemented
OK0718 # 07 Y:2005 07 2005 USE OPTIMUM THICKNESS INSULATION $2,162 $1,710 Implemented
OK0718 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,343 $1,693 Implemented
OK0718 # 05 Y:2005 05 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,243 $5,175 Not Implemented
OK0718 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,239 $8,030 Not Implemented
OK0718 # 03 Y:2005 03 2005 USE COMPRESSOR AIR FILTERS $5,034 $459 Not Implemented
OK0718 # 01 Y:2005 01 2005 DEVELOP A REPAIR/REPLACE POLICY $12,970 $500 Implemented
TA0058 # 01 Y:2003 01 2003 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $15,460 $0 Implemented
TA0058 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,000 $400 Implemented
TA0058 # 03 Y:2003 03 2003 AIR CONDITION ONLY SPACE NECESSARY $2,500 $100 Implemented