IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
NAICS 32519 Other Basic Organic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0350 # 03 Y:2006 03 2006 USE OPTIMUM THICKNESS INSULATION $12,275 $1,000 Implemented
NC0350 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,138 $10,500 Not Implemented
NC0350 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $122,745 $114,000 Not Implemented
NC0350 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $100 Implemented
NC0350 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,381 $2,000 Not Implemented
NC0348 # 02 Y:2006 02 2006 CLEAN CONDENSER TUBES $123,800 $5,000 Not Implemented
NC0348 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,457 $2,420 Not Implemented
NC0348 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $98,735 $59,350 Not Implemented
NC0348 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $8,998 $7,650 Not Implemented
NC0348 # 03 Y:2006 03 2006 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $315,779 $167,000 Not Implemented
NC0348 # 04 Y:2006 04 2006 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $23,395 $10,000 Not Implemented
LE0247 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,912 $3,722 Not Implemented
LE0247 # 06 Y:2006 06 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,646 $2,500 Implemented
LE0247 # 03 Y:2006 03 2006 REPAIR OR REPLACE STEAM TRAPS $26,312 $16,000 Not Implemented
LE0247 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,245 $15,000 Not Implemented
LE0247 # 01 Y:2006 01 2006 REPLACE BOILER $115,080 $223,000 Not Implemented
LE0247 # 02 Y:2006 02 2006 REVISE RAW MATERIAL SPECS $106,250 $60,000 Not Implemented
LE0247 # 04 Y:2006 04 2006 ADOPT IN-HOUSE MATERIAL GENERATION $24,012 $20,000 Implemented
LE0247 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $1,181 $300 Not Implemented
LE0247 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,225 $1,152 Implemented
UD0750 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $79,000 $45,000 Implemented
UD0750 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $226,890 $120,000 Implemented
UD0750 # 03 Y:2006 03 2006 REPAIR OR REPLACE STEAM TRAPS $155,000 $187,200 Implemented
UD0750 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $56,000 $0 Not Implemented
UD0750 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $273,386 $100,000 Not Implemented