IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 325193 Ethyl Alcohol Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UMS011 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $40,000 $40,000 Not Implemented
UMS011 # 05 Y:2012 05 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $100,000 $200,000 Not Implemented
UMS011 # 04 Y:2012 04 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $113,000 $70,000 Not Implemented
UMS011 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $196,000 $300,000 Not Implemented
UMS011 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $275,000 $500,000 Not Implemented
UMS011 # 01 Y:2012 01 2012 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,224,000 $1,300,000 Not Implemented
UMS007 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $85,000 $100,000 Not Implemented
UMS007 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $157,000 $200,000 Not Implemented
UMS007 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $480,000 $800,000 Implemented
UMS007 # 01 Y:2012 01 2012 OPERATE BOILERS ON HIGH FIRE SETTING $1,630,000 $0 Not Implemented
UMS005 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,330,000 $1,500,000 Not Implemented
UMS005 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $305,000 $300,000 Not Implemented
UMS005 # 02 Y:2012 02 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $107,000 $50,000 Not Implemented
UD0745 # 01 Y:2006 01 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,706 $0 Implemented
UD0745 # 13 Y:2006 13 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $592 $0 Not Implemented
UD0745 # 12 Y:2006 12 2006 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $941 $0 Implemented
UD0745 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,408 $0 Implemented
UD0745 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,746 $8,200 Implemented
UD0745 # 09 Y:2006 09 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $6,163 $12,326 Not Implemented
UD0745 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,810 $4,500 Not Implemented
UD0745 # 07 Y:2006 07 2006 USE OPTIMUM THICKNESS INSULATION $8,710 $4,000 Implemented
UD0745 # 06 Y:2006 06 2006 METER WASTE WATER $10,810 $0 Not Implemented
UD0745 # 05 Y:2006 05 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,968 $500 Not Implemented
UD0745 # 04 Y:2006 04 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $11,027 $30,000 Not Implemented
UD0745 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,936 $18,000 Not Implemented