Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
142
matching recommendationsNAICS | 325199 | All Other Basic Organic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0313 # 01 Y:2024 | 01 | 2024 | OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS | $9,651 | $7,079 | Implemented |
IC0313 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,562 | $0 | Implemented |
IC0313 # 06 Y:2024 | 06 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,557 | $0 | Implemented |
IC0313 # 09 Y:2024 | 09 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $19,590 | $704 | Implemented |
IC0313 # 10 Y:2024 | 10 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,979 | $2,430 | Implemented |
IC0313 # 11 Y:2024 | 11 | 2024 | INSULATE BARE EQUIPMENT | $4,631 | $8,869 | Implemented |
MI0441 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $58,244 | $186,000 | Implemented |
MI0441 # 03 Y:2024 | 03 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $21,427 | $1,306 | Implemented |
MI0441 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $671 | $1,203 | Implemented |
MI0441 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,377 | $510 | Implemented |
MI0441 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,124 | $1,980 | Implemented |
IP0121 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $662 | $23 | Implemented |
IP0121 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,800 | $4,725 | Implemented |
IP0121 # 03 Y:2019 | 03 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,721 | $260 | Implemented |
IP0121 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $252 | $476 | Implemented |
IP0121 # 10 Y:2019 | 10 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,795 | $17,400 | Implemented |
UF0512 # 06 Y:2017 | 06 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,845 | $2,750 | Implemented |
UF0512 # 10 Y:2017 | 10 | 2017 | INSTALL COMMON HEADER ON COMPRESSORS | $3,951 | $11,185 | Implemented |
UF0512 # 08 Y:2017 | 08 | 2017 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,636 | $6,225 | Implemented |
UF0512 # 09 Y:2017 | 09 | 2017 | INCREASE AMOUNT OF CONDENSATE RETURNED | $4,891 | $0 | Implemented |
UF0512 # 03 Y:2017 | 03 | 2017 | OPTIMIZE PLANT POWER FACTOR | $38,189 | $13,000 | Implemented |
UF0512 # 02 Y:2017 | 02 | 2017 | ISOLATE HOT OR COLD EQUIPMENT | $124,880 | $17,000 | Implemented |
UF0512 # 05 Y:2017 | 05 | 2017 | USE CORRECT SIZE STEAM TRAPS | $27,893 | $340 | Implemented |
UF0512 # 12 Y:2017 | 12 | 2017 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $280,764 | $300,000 | Implemented |
UF0512 # 07 Y:2017 | 07 | 2017 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $26,348 | $725 | Implemented |