Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
340
matching recommendationsNAICS | 325199 | All Other Basic Organic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0134 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,090 | $10,500 | Not Implemented |
DL0134 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,200 | $13,590 | Not Implemented |
DL0134 # 08 Y:2014 | 08 | 2014 | METER WASTE WATER | $8,610 | $8,200 | Implemented |
UD0901 # 06 Y:2014 | 06 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $25,546 | $28,000 | Not Implemented |
UD0901 # 05 Y:2014 | 05 | 2014 | REDUCE FLUID FLOW RATES | $151,019 | $100,000 | Implemented |
UD0901 # 04 Y:2014 | 04 | 2014 | RECOVER AND REUSE COOLING WATER | $221,902 | $100,000 | Implemented |
UD0901 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $1,149 | $190 | Not Implemented |
UD0901 # 02 Y:2014 | 02 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,289 | $800 | Not Implemented |
UD0901 # 01 Y:2014 | 01 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,645 | $1,000 | Not Implemented |
UD0901 # 08 Y:2014 | 08 | 2014 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,748 | $1,000 | Not Implemented |
UD0901 # 07 Y:2014 | 07 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,426 | $0 | Not Implemented |
UD0901 # 09 Y:2014 | 09 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $2,267 | $8,850 | Not Implemented |
UD0901 # 10 Y:2014 | 10 | 2014 | REDUCE VENTILATION AIR | $31,388 | $33,025 | Implemented |
UD0901 # 11 Y:2014 | 11 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,379 | $16,055 | Not Implemented |
AM0651 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,615 | $1,485 | Implemented |
AM0651 # 02 Y:2014 | 02 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,525 | $400 | Implemented |
AM0651 # 08 Y:2014 | 08 | 2014 | INSULATE FEEDWATER TANK | $290 | $320 | Not Implemented |
AM0651 # 07 Y:2014 | 07 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,630 | $1,452 | Not Implemented |
AM0651 # 06 Y:2014 | 06 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,950 | $0 | Implemented |
AM0651 # 05 Y:2014 | 05 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,725 | $500 | Implemented |
AM0651 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,745 | $735 | Implemented |
AM0651 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,180 | $1,500 | Implemented |
LE0371 # 17 Y:2014 | 17 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $71 | $350 | Not Implemented |
LE0371 # 16 Y:2014 | 16 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,704 | $12,536 | Not Implemented |
LE0371 # 15 Y:2014 | 15 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,748 | $21,000 | Not Implemented |