Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 325199 | All Other Basic Organic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0694 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,157 | $2,968 | Implemented |
OK0694 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $2,247 | $2,094 | Implemented |
OK0694 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $65,085 | $407,420 | Not Implemented |
OK0694 # 03 Y:2004 | 03 | 2004 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $9,026 | $9,344 | Not Implemented |
OK0694 # 02 Y:2004 | 02 | 2004 | BURN A LESS EXPENSIVE GRADE OF FUEL | $60,059 | $691 | Not Implemented |
OK0694 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,045,517 | $1,029,484 | Not Implemented |
UM0254 # 02 Y:2004 | 02 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,650 | $2,200 | Implemented |
UM0254 # 06 Y:2004 | 06 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,010 | $1,080 | Implemented |
UM0254 # 01 Y:2004 | 01 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $31,255 | $30,000 | Not Implemented |
UM0254 # 04 Y:2004 | 04 | 2004 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,584 | $15,000 | Not Implemented |
UM0254 # 05 Y:2004 | 05 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,267 | $10,000 | Not Implemented |
UM0254 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,479 | $1,038 | Implemented |
UM0254 # 03 Y:2004 | 03 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,907 | $0 | Implemented |
TA0058 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,000 | $400 | Implemented |
TA0058 # 08 Y:2003 | 08 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $214 | $120 | Not Implemented |
TA0058 # 07 Y:2003 | 07 | 2003 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $155 | $0 | Implemented |
TA0058 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $190 | $123 | Not Implemented |
TA0058 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $335 | $0 | Implemented |
TA0058 # 04 Y:2003 | 04 | 2003 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,800 | $0 | Implemented |
TA0058 # 03 Y:2003 | 03 | 2003 | AIR CONDITION ONLY SPACE NECESSARY | $2,500 | $100 | Implemented |
TA0058 # 01 Y:2003 | 01 | 2003 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $15,460 | $0 | Implemented |
IC0060 # 05 Y:2003 | 05 | 2003 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $92,294 | $190,000 | Not Implemented |
IC0060 # 06 Y:2003 | 06 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,196 | $22,867 | Not Implemented |
IC0060 # 08 Y:2003 | 08 | 2003 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,439 | $6,850 | Not Implemented |
IC0060 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,390 | $20,640 | Implemented |