Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,201
matching recommendationsNAICS | 3252 | Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0628 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,671 | $41,856 | n/a |
UF0628 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $43,459 | $43,906 | n/a |
UF0628 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,801 | $322,608 | n/a |
UF0628 # 08 Y:2025 | 08 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $2,783 | $6,000 | n/a |
UF0628 # 09 Y:2025 | 09 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,115 | $1,235 | n/a |
UF0628 # 10 Y:2025 | 10 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $514 | $1,235 | n/a |
UF0628 # 12 Y:2025 | 12 | 2025 | IMPROVE SPACE COMFORT CONDITIONING | $4,645 | $1,476 | n/a |
UF0628 # 07 Y:2025 | 07 | 2025 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $3,937 | $18,930 | n/a |
UF0628 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,938 | $0 | n/a |
UF0628 # 11 Y:2025 | 11 | 2025 | IMPROVE SPACE COMFORT CONDITIONING | $141,216 | $3,660 | n/a |
UF0628 # 05 Y:2025 | 05 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $4,580 | $16,608 | n/a |
UF0628 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,464 | $25,640 | n/a |
MZ0371 # 04 Y:2025 | 04 | 2025 | REPLACE BOILER | $383,764 | $475,000 | n/a |
MZ0371 # 02 Y:2025 | 02 | 2025 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,063 | $3,900 | n/a |
MZ0371 # 03 Y:2025 | 03 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $1,555 | $5,880 | n/a |
MZ0371 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,847 | $3,600 | n/a |
IC0322 # 10 Y:2025 | 10 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,536 | $2,000 | n/a |
IC0322 # 11 Y:2025 | 11 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $205 | $144 | n/a |
IC0322 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,000 | $1,250 | n/a |
IC0322 # 02 Y:2025 | 02 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $5,455 | $41,668 | n/a |
IC0322 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,658 | $693 | n/a |
IC0322 # 01 Y:2025 | 01 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $102,930 | $45,500 | n/a |
IC0322 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,262 | $24,421 | n/a |
IC0322 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,041 | $210 | n/a |
IC0322 # 03 Y:2025 | 03 | 2025 | INCREASE AMOUNT OF CONDENSATE RETURNED | $36,404 | $43,673 | n/a |