Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,232
matching recommendationsNAICS | 3252 | Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2507 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,632 | $24,675 | n/a |
UL2507 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,773 | $527,158 | n/a |
UL2507 # 03 Y:2025 | 03 | 2025 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $16,032 | $37,000 | n/a |
UL2506 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,323 | $17,116 | n/a |
UL2506 # 05 Y:2025 | 05 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,709 | $151,700 | n/a |
UL2506 # 01 Y:2025 | 01 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $77,396 | $40,000 | n/a |
UL2506 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $49,775 | $25,480 | n/a |
UL2506 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,455 | $2,940 | n/a |
UL2506 # 03 Y:2025 | 03 | 2025 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $43,343 | $86,469 | n/a |
WV0682 # 10 Y:2025 | 10 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $5,033 | $8,967 | n/a |
WV0682 # 11 Y:2025 | 11 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,702 | $378 | n/a |
WV0682 # 09 Y:2025 | 09 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,955 | $3,160 | n/a |
WV0682 # 13 Y:2025 | 13 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $4,273 | $13,665 | n/a |
WV0682 # 15 Y:2025 | 15 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,069 | $1,258 | n/a |
WV0682 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $13,054 | $14,058 | n/a |
WV0682 # 07 Y:2025 | 07 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,508 | $5,220 | n/a |
WV0682 # 05 Y:2025 | 05 | 2025 | INSULATE BARE EQUIPMENT | $17,044 | $488 | n/a |
WV0682 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,561 | $12,599 | n/a |
WV0682 # 08 Y:2025 | 08 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $7,131 | $13,250 | n/a |
WV0682 # 14 Y:2025 | 14 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,661 | $900 | n/a |
WV0682 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $98,686 | $61,240 | n/a |
WV0682 # 02 Y:2025 | 02 | 2025 | MINIMIZE WATER USAGE | $71,374 | $60,060 | n/a |
WV0682 # 04 Y:2025 | 04 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $17,883 | $6,000 | n/a |
WV0682 # 12 Y:2025 | 12 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,346 | $11,060 | n/a |
UF0628 # 10 Y:2025 | 10 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $514 | $1,235 | n/a |