Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148
matching recommendationsNAICS | 3252 | Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0574 # 03 Y:2019 | 03 | 2019 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $9,375 | $3,276 | Not Implemented |
WV0574 # 09 Y:2019 | 09 | 2019 | MINIMIZE WATER USAGE | $615 | $2,100 | Not Implemented |
WV0574 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,691 | $46 | Implemented |
WV0574 # 01 Y:2019 | 01 | 2019 | REVISE RAW MATERIAL SPECS | $26,910 | $52,500 | Not Implemented |
WV0535 # 06 Y:2016 | 06 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $1,538 | $578 | Implemented |
WV0535 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,622 | $2,120 | Implemented |
WV0535 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,030 | $6,200 | Not Implemented |
WV0535 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,812 | $8,931 | Not Implemented |
WV0535 # 04 Y:2016 | 04 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $2,918 | $4,500 | Not Implemented |
WV0535 # 03 Y:2016 | 03 | 2016 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,206 | $1,000 | Implemented |
WV0535 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $4,153 | $511 | Implemented |
WV0535 # 10 Y:2016 | 10 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $260 | $138 | Implemented |
WV0535 # 09 Y:2016 | 09 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $320 | $298 | Implemented |
WV0535 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $691 | $30 | Implemented |
UD0935 # 05 Y:2015 | 05 | 2015 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $115,856 | $487,083 | Not Implemented |
UD0935 # 04 Y:2015 | 04 | 2015 | REDUCE EXCESS STEAM BLEEDING | $946,498 | $1,450,100 | Not Implemented |
UD0935 # 03 Y:2015 | 03 | 2015 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $1,230 | $2,475 | Not Implemented |
UD0935 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,176 | $3,100 | Not Implemented |
UD0935 # 01 Y:2015 | 01 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,152 | $0 | Implemented |
UD0917 # 02 Y:2014 | 02 | 2014 | REDUCE FLUID FLOW RATES | $3,671 | $0 | Not Implemented |
UD0917 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,376 | $0 | Implemented |
UD0917 # 06 Y:2014 | 06 | 2014 | INSULATE BARE EQUIPMENT | $6,046 | $6,000 | Not Implemented |
UD0917 # 05 Y:2014 | 05 | 2014 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $14,607 | $30,000 | Not Implemented |
UD0917 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,576 | $13,517 | Implemented |
UD0917 # 03 Y:2014 | 03 | 2014 | RECOVER AND REUSE COOLING WATER | $3,388 | $0 | Implemented |