IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 3252 Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0791 # 01 Y:2024 01 2024 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $29,053 $352,000 n/a
OR0791 # 02 Y:2024 02 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,032 $0 n/a
OR0791 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $2,606 $17,324 n/a
OR0791 # 04 Y:2024 04 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $2,079 $5,750 n/a
OR0788 # 04 Y:2024 04 2024 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $6,183 $30,000 Not Implemented
OR0788 # 02 Y:2024 02 2024 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $25,469 $250,000 Not Implemented
OR0788 # 01 Y:2024 01 2024 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $126,866 $2,500,000 Implemented
OR0788 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,448 $150,000 Not Implemented
OR0788 # 06 Y:2024 06 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $2,489 $150,000 Not Implemented
OR0788 # 05 Y:2024 05 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,766 $200,000 Not Implemented
OR0772 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $5,801 $7,178 Not Implemented
OR0772 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,514 $8,385 Implemented
OR0772 # 02 Y:2023 02 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,363 $1,352 Not Implemented
OR0772 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,304 $25,167 Not Implemented
OR0772 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $1,740 $3,039 Implemented
OR0772 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $1,312 $5,390 Implemented
OR0706 # 01 Y:2018 01 2018 REPAIR AND ELIMINATE STEAM LEAKS $12,552 $1,970 Implemented
OR0706 # 02 Y:2018 02 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $15,952 $28,542 Not Implemented
OR0706 # 03 Y:2018 03 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,311 $2,097 Not Implemented
OR0706 # 04 Y:2018 04 2018 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $8,000 $24,775 Implemented
OR0706 # 05 Y:2018 05 2018 REDUCE FLUID FLOW RATES $1,821 $3,221 Not Implemented
OR0706 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $854 $0 Implemented
OR0534 # 09 Y:2008 09 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $829 $2,700 Not Implemented
OR0534 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $1,219 $2,510 Implemented
OR0534 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $127 $125 Not Implemented