IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
NAICS 3252 Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0833 # 02 Y:2006 02 2006 ELIMINATE/REDUCE AN OPERATION $137,445 $0 Not Implemented
GT0833 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,153 $0 Not Implemented
GT0833 # 04 Y:2006 04 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,806 $18,000 Not Implemented
GT0833 # 05 Y:2006 05 2006 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $29,400 $0 Implemented
GT0833 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,653 $550 Not Implemented
GT0833 # 07 Y:2006 07 2006 PAY BILLS ON TIME TO AVOID LATE FEES $6,204 $0 Implemented
GT0833 # 08 Y:2006 08 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $36,891 $62,250 Not Implemented
GT0833 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $870,069 $100,000 Not Implemented
UF0392 # 02 Y:2006 02 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $28,316 $138,000 Not Implemented
UF0392 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,532 $585 Implemented
UF0392 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $238 $228 Not Implemented
UF0392 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $535 $486 Not Implemented
UF0392 # 01 Y:2006 01 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $32,112 $2,775 Implemented
UF0392 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,311 $8,824 Implemented
UF0392 # 07 Y:2006 07 2006 USE OPTIMUM THICKNESS INSULATION $2,922 $1,680 Not Implemented
OK0739 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,734 $9,485 Not Implemented
OK0739 # 03 Y:2006 03 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $139,230 $39,852 Not Implemented
OK0739 # 05 Y:2006 05 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,090 $7,944 Implemented
OK0739 # 02 Y:2006 02 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $156,872 $2,175,000 Not Implemented
OK0739 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,798 $9,750 Implemented
OK0739 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,587 $191 Implemented
OK0739 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,011 $390 Not Implemented
UM0315 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $34,667 $8,066 Not Implemented
UM0315 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,713 $40,991 Not Implemented
UM0315 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $32,300 $80,207 Not Implemented